Similar Projects
Wrightstown - Denmark, STH 32 - CTH G; Wrightstown - Denmark, CTH G - IH 43
New Construction, Infrastructure
Bidding
$9,000,000 to $11,000,000 est. value
WI

Wisconsin Dells - Portage, Baraboo River Bridges
New Construction, Infrastructure
Bidding
$1,250,000 est. value
WI

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

County Trunk Highways N & J Bridge Replacements
Results
WI

Town of Marietta, Marietta Valley Road, Woodward Hollow Creek Bridge
Results
Less than $20,000 est. value
WI

Linden Drive Pedestrian Bridge Repair
New Construction, Infrastructure
Bidding
$130,000 est. value
Madison, WI 53706

Rowan Creek Snowmobile Bridge Replacement
Post-Bid
WI

Town of Scott, Byers Road, Richland Creek Bridge
Results
Less than $20,000 est. value
WI

IH 43, City of Green Bay, Leo Frigo Bridge
Renovation, Infrastructure
Bidding
$3,000,000 to $3,999,999 est. value
Green Bay, WI 54344

Bridge Deck Polymer Overlay - 2022
Renovation, Infrastructure
Post-Bid
Wascott, WI

CTH FF - CTH KP, East Branch Blue Mound Creek Bridge
Results
Less than $75,000 est. value
WI

Troubled Waters Bridge Repair
Renovation, Infrastructure
Bidding
$400,000 est. value
Eau Claire, WI

Tecumseh Ave S Bridge Retaining Wall
New Construction, Infrastructure
Post-Bid
$500,000 est. value
Monona, WI 53716

C Eau Claire, Dewey Street, Eau Claire River Bridge
Results
Less than $100,000 est. value
Eau Claire, WI

Last Updated 05/25/2022 02:15 AM
Project Title

Bridge 3-22 (Ashland Avenue Over CNRR and 6th Street B 5 018 Expansion Joint Reconstruction)

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54344   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract will consist of reconstruction of the concrete expansion joints, installation of a compression joint seal as well as traffic control on B-5-018 Ashland Avenue Bridge over CNRR and 6th Street. The repair work shall include furnishing all the material, labor, tools, equipment, services, methods, skills and supervision as required to complete the work.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents