Similar Projects
Construction of a Five (5) Single-family Housing Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Green River, UT 84525

Millsite County Road Riprap and Fish Habitat
Infrastructure
Bidding
$180,000 CJ est. value
Ferron, UT 84523

Reclamation of BLM Pits, Rochester, South Moore and Lila Canyon
Infrastructure
Post-Bid
$223,000 est. value
Castle Dale, UT

Sidewalk Project, 2022
Infrastructure
Post-Bid
$80,000 CJ est. value
Orangeville, UT 84537

Huntington State Park Restrooms Building
Demolition, New Construction, Infrastructure
Results
$698,223 CJ est. value
Huntington, UT 84528

Huntington State Park Restrooms Building
Demolition, New Construction, Infrastructure
Results
$698,223 CJ est. value
Huntington, UT 84528

Farmington Bay Dyke-Line Restoration
Infrastructure
Post-Bid
$300,000 CJ est. value
Orangeville, UT 84537

CC and H Canal Pipeline Installation Project
Infrastructure
Results
$365,551 CJ est. value
Castle Dale, UT 84513

Applecross Station Visitor Center
Infrastructure
Post-Bid
$60,000 CJ est. value
Orangeville, UT 84537

Lower Miller Creek BDAs
Infrastructure
Results
$20,000 CJ est. value
Orangeville, UT 84537

Zion Mountain Local Service District - Applecross Station Visitor Center General Contractor - Main Building
New Construction, Infrastructure
Post-Bid
$170,000 CJ est. value
Orangeville, UT 84537

Fiber Connection From the Garfield County Sheriff's Office to the Cedar PSAP
Infrastructure
Post-Bid
$370,000 CJ est. value
Orangeville, UT 84537

Installation and Construction of Approximately 1200 Linear Feet of Sidewalk
Infrastructure
Post-Bid
$220,000 CJ est. value
Huntington, UT 84528

Cleveland South Water Hydrant Connection Project
Infrastructure
Post-Bid
$980,000 CJ est. value
Cleveland, UT 84518

Castle Dale City Bike Trail Project 2023
Infrastructure
Post-Bid
$1,080,000 CJ est. value
Castle Dale, UT 84513

Last Updated 02/27/2023 01:10 PM
Project Title

Department of Natural Resources Green River State Park Campground and Lodging Expansion

Physical Address View project details and contacts
City, State (County) Green River, UT 84525   (Emery County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,676,951 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to add 13 camp sites, 1 group site, a restroom facility, utilities and surface improvements. The base bid shall include all work and materials associated with this project as outlined in the plans and specs. The contractor will be required to pay impact fees to Green River City. Impact fees are anticipated to be $5,000.00 and should be included in the base bid. Only Firms Pre-qualified During Stage I of the Rfs Are Allowed to Bid on This Project QUESTIONS DEADLINE Tuesday, January 24, 2023 3:00 PM

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents