Similar Projects
UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

Precast Stormwater Box
Results
Less than $7,000 est. value
Riverton, UT

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Lone Peak Parkway - 12000 South Culvert Extension
Results
Less than $300,000 est. value
Draper, UT 84020

Traverse Ridge Storm Drain
Post-Bid
Draper, UT

2550 South 7200 West to 8000 West Surcharge and Culvert Package
Results
$2,800,000 to $3,500,000 est. value
Salt Lake City, UT 84190

Segmented Pipe Liner
Term Contract
Post-Bid
UT

Road and Drainage Improvements - Central Avenue
Results
$300,000 to $400,000 est. value
Millcreek, UT 84107

10th East Senior Center Retaining Wall
Post-Bid
Salt Lake City, UT 84114

Anna Caroline Drive Bridge
Results
Less than $443,240 est. value
West Valley City, UT 84119

Hog Hollow Soil Repair
Post-Bid
Less than $175,000 est. value
Herriman, UT 84065

Sandy Canal Trail Design 9400 South to Lazon Drive
Results
Sandy, UT 84094

I-80; Culvert Rehabilitation
Post-Bid
$500,000 to $1,500,000 est. value

Last Updated 11/25/2019 08:29 PM
Project Title

Zone 3 North 3 MG Reservoir Project

Physical Address View project details and contacts
City, State (County) West Jordan, UT 84088   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $3,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the construction of a new 3 MG AWWA D110, Type 1, pre-stressed concrete reservoir; inlet/outlet valve vault; under drain vault; reservoir inlet, outlet, under drain, drain, overflow, and wash down piping; connections to existing yard piping; temporary piping, electrical and SCADA connections during construction; landscaping, restoration and irrigation; new site electrical service, electrical, instrumentation and controls; testing, disinfection, commissioning and startup. Work includes connecting reservoir and vaults to new power service; surface preparation and painting of new reservoir; excavation, backfill, earthwork; fencing and gates; asphalt access roads and asphalt restoration associated with construction of new facilities.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents