Similar Projects
HVAC Maintenance and Repair at Cheltenham Youth Center
Post-Bid
Cheltenham, MD 20623

NMIC-1 Replace 4 Chillers and Controls/Install Chiller Catwalks Project, National Maritime Intelligence Center, Suitland, Maryland
Post-Bid
$10,000,000 to $25,000,000 est. value
Suitland, MD

Portable Air Conditioning Preventative Maintenance and Repairs
Results
Berwyn Heights, MD 20740

Glassmanor Elementary School - Building Envelope and Central HVAC Conversion
Results
$3,000,000 est. value
Upper Marlboro, MD 20745

RGH Air Condition Unit Replacement
Post-Bid
Laurel, MD 20707

J.E. Proctor Building Chiller Replacement
Results
Bowie, MD 20715

HVAC Preventative Maintenance and Service
Post-Bid

Croom High School HVAC Modernization
Results
Less than $1,700,000 est. value
Cheltenham, MD 20623

Dust Collection Unit
Post-Bid
Andrews Air Force Base, MD 20762

Thurgood Marshall Library Cooling Tower Replacement
Results
Bowie, MD 20715

BARC MCquay Range #2 Chiller
Post-Bid
Beltsville, MD 20705

Recommissioning (ReCx) Repairs Building: BARC 052 Controls
Results
$25,000 to $100,000 est. value
Beltsville, MD 20705

HVAC System Replacement for the 6000- Series
Post-Bid
Greenbelt, MD 20770

BARC - Overhaul Building 010A Chiller #2
Results
Beltsville, MD 20705

Water Treatment Service Contract
Post-Bid
College Park, MD 20742

Reported 04/01/2021 12:00 AM
Project Title

Full Service Maintenance Contract for Carrier Equipment

Physical Address View project details and contacts
City, State (County) College Park, MD 20742   (Prince Georges County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The University of Maryland is seeking a Contracting to provide Full Service Air Conditioning Preventative Maintenance on “Carrier” Equipment located at the University of Maryland College Park Campus. Contract will commence on May 1, 2021 for a period of one (1) year with renewable options.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents