Similar Projects
S201--644 | Canteen Hood Cleaning Phoenix VA Health Care System
Term Contract
Design
Phoenix, AZ 85012

Annual Inspection and Maintenance For Two York YVWA Chillers
Term Contract
Design
Phoenix, AZ 85040

Army Nationwide MEDCOM Replace 3 Condenser Water Pumps B1132
Renovation
Sub-Bidding
$250,000 CJ est. value
Glendale, AZ 85309

Highland Elementary School Central Plant Upgrades
Term Contract
Post-Bid
$100,000 est. value
Mesa, AZ 85213

Smith Jr High Cooling Tower Replacements
Alteration
Post-Bid
$600,000 est. value
Mesa, AZ 85207

J041--644 - Chiller Maintenance Base Year
Term Contract
Results
Phoenix, AZ 85012

J041--Condensate Tank Replacement
Term Contract
Results
Phoenix, AZ 85012

Robson Elementary Cooling Tower Replacement
Alteration
Post-Bid
$600,000 est. value
Mesa, AZ 85204

Pomeroy Elementary School Central Plant Upgrades
Term Contract
Results
$1,100,000 to $1,200,000 est. value
Chandler, AZ 85224

HVAC Parts, Repair Services and Pump Rebuilds
Alteration
Post-Bid
Glendale, AZ

DEMA HVAC Service, Repair, Maintenance
Alteration
Results
Bellemont, Buckeye, Florence, Marana, Phoenix, Show Low, AZ 85008

ASU Chiller Replacement
Alteration
Post-Bid
Tempe, AZ 85281

SFB Multiple HVAC Project
Alteration
Results
Buckeye, AZ 85326

Buckeye Union High School Cooling Tower Replacement Project
Alteration
Post-Bid
$100,000 est. value
Buckeye, AZ 85326

DEMA HVAC Chemical Water Treatment and Maintenance Program
Alteration
Results
Phoenix, AZ 85034

Last Updated 03/30/2023 07:05 AM
Project Title

Two (2) Evaporative Cooler Replacement at McClintock HS

Physical Address View project details and contacts
City, State (County) Tempe, AZ 85282   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $108,639 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Last day for questions and clarifications is March 1, 2023 at 5:00 PM Arizona Local Prevailing Time. Please must be submit all questions through Tempe Union High School District E-Procurement systems at tuhsd.bonfirehub.com. This project involves the replacement of two ARES evaporative cooler with attached furnaces. These two (2) units are on the roof of 1000 building at McClintock High School and provide heating and cooling to the Physical Education locker rooms. Remove, Furnish and Install Two (2) Evaporative Coolers with attached Furnaces Location: McClintock High School 1830 E. Del Rio Drive Tempe, Arizona 85282 Existing Equipment Information: o Manufacturer: ARES o Model: 400 NESE DFO o Fuel: Natural Gas Furnace o Voltage: 120/Single Phase o CFM: 6000 Scope: o Remove the existing evaporative cooler units with attached furnaces; o Use existing roof curbs if possible if not replace with roof curbing that will accommodate replacement equipment; o De-energize power and prepare for connection to the replacement units; o Disconnect existing controls and prepare for connection to the replacement units; o Disconnect the existing gas piping and prepare for connection to the new furnaces; o Disconnect the existing water line and prepare for connection to the new evaporative coolers; o Furnish and install the new evaporative cooler/furnaces onto the roof of the 1000 building; and o Any roofing repairs to be made by roofing contractor. Special instructions: o The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the Contract Documents, and shall not unreasonably encumber the site with any materials or equipment. The existing facility will be occupied Monday through Friday from 7AM to 3PM. No work to occur during those days and hours. Contractor must work evenings, nights and weekends to complete the scope of work; and o The Contractor will have the option to work during school hours if they can prove that it will disrupt the operation of school and compromise life safety. The District/Owner will still have the final decision regarding if the Contractor can work or not work during school hours.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents