Similar Projects
0.120 MGD Wastewater Treatment Plant Project
Post-Bid
Woodloch, TX 77385

Roberto R. Bustamante Wastewater Treatment Plant - Digester No. 2 Rehabilitation
Post-Bid
El Paso, TX 79925

Wastewater Treatment Plant Phase 1
Results
Less than $2,139,671 est. value
TX

Salitrillo Wastewater Treatment Plant Progressive Design Build Upgrades
Results
Less than $25,000,000 est. value
San Antonio, TX 78204

Clarifier Scum Screen
Post-Bid
Houston, TX 77020

Carters Creek Centrifuge Improvements
Results
Less than $3,900,000 est. value
Brazos, TX 77842

WWTP Improvements TWDB
Post-Bid
Huntington, TX

North Corridor Consolidation Package 1
Results
Less than $23,837,012 est. value
Houston, TX 77000

Centrifuge Control Panel Replacement at Robinson Creek WWTP
Post-Bid
Huntsville, TX

Manvel Town Center Wastewater Treatment Plant Phase 1
Results
TX

Wastewater Treatment Plant Improvements
Post-Bid
Falfurrias, TX

Annual Contract for Central Utility Plant (CUP) Preventive Maintenance and Repairs
Term Contract
Results
San Antonio, TX 78216

WWTP Phase I
Post-Bid
Conroe, TX

Zacate Wastewater Treatment Plant West Aeration Basin Oxygen Transfer - Aeration Equipment Upgrade
Results
Less than $209,380 est. value
Laredo, TX 78043

Pradera Oaks Wastewater Treatment Plant
Post-Bid
Bonney, TX 77515

Last Updated 03/30/2022 08:41 AM
Project Title

Manadas Creek Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Laredo, TX 78045   (Webb County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work shall include a new Wastewater Treatment Plant with a pennitted treatment capacity of 4.75 MGD and consist of two gravity interceptor pipe systems, liquid treatment process including lift station, headworks screening, odor control system, extended air activated sludge aeration basins, secondary clarification, RAS/WAS pump station, ultra-violet disinfection and associated yard piping, controls and gravity pipe outfall to Manadas Creek Tributary 2. Solids handling processes include thickening of WAS, aerated sludge holding tank, gravity belt thickening and belt filter press dewatering. The facility is master planned for a future conversion to complete mix activated sludge aeration to accommodate ultimate projected flows

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents