Similar Projects
Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Address Pavement Condition
Infrastructure
Conception
$3,250,000 CJ est. value
Elizabethtown, KY 42701

Install Guardrail on KY-522 in Harlan County
Infrastructure
Conception
$634,000 CJ est. value
Totz, KY 40870

Old Schoolhouse Lane Subdivision
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Lexington, KY 40513

Reconstruct Between KY 120 and RR Bridge
Infrastructure
Conception
$1,360,000 CJ est. value
Slaughters, KY 42456

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Publix Super Market at Marshall Commons / Louisville
New Construction, Infrastructure - 58,501 SF
Conception
$15,000,000 CJ est. value
Louisville, KY 40241

Address Pavement Condition of PCC Pavement on I-24 Both Direction(S)
Infrastructure
Conception
$6,500,000 CJ est. value
Hopkinsville, KY 42240

Address Pavement Condition of I-75 Non-Cardinal Direction(S)
Infrastructure
Conception
$1,250,000 CJ est. value
Williamstown, KY 41097

Improve KY-207 From the Industrial Parkway to the KY-693 Intersection
Infrastructure
Conception
$32,900,000 CJ est. value
Flatwoods, KY 41139

Address Pavement Condition of Edward T. Breathitt Pennyrile Parkway Both Direction(S)
Infrastructure
Conception
$1,750,000 CJ est. value
Hopkinsville, KY 42240

Address Pavement Condition of Julian M. Carroll Purchase Parkway Both Direction(S)
Infrastructure
Conception
$1,750,000 CJ est. value
Fulton, KY 42041

Improve Safety, Congestion, and Pedestrian and Freight Mobility on US 42
Infrastructure
Conception
$7,880,000 CJ est. value
Warsaw, KY 41095

Safety Improvements on KY 3424
Infrastructure
Conception
$1,300,000 CJ est. value
Hyden, KY 41749

Last Updated 03/16/2023 05:34 AM
Project Title

Cynthiana (0I8) Pavement Maintenance

Physical Address View project details and contacts
City, State (County) Cynthiana, KY 41031   (Harrison County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of tie down removal, crack filling, sealing, and marking asphalt pavement. The Bidder shall refer to the Proposal and Summary of Quantities included in the specifications and plans for planned quantities. The Bidder shall refer to the supplemental and technical specifications for more material and construction specifications. Paving (Asphalt or Concrete), Pavement Resurface and Rehabilitation, Airport: Runways, Taxiways, Access Roads, Aprons, Pavement - Marking Pre-Qualification: Yes

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents