Similar Projects
Cape May Substation Reliability Project
New Construction, Demolition
Design
$35,000,000 est. value
Cape May, NJ 08204

Replacement of Existing Substation No. 8 & Replacement of Existing Substation No. 14
Construction
$70,000,000 to $90,000,000 est. value
Harrison, Kearny, NJ

PSE&G Texas Avenue Substation Addition
Addition
Design
Lawrence Township, NJ 08648

PSE&G Lawnside Substation Addition
Addition
Conception
$1,000,000 to $5,000,000 CJ est. value
Lawnside, NJ 08045

NJ Transitgrid Traction Power System
- 32,000 SF
Post-Bid
$77,400,000 est. value
Kearny, NJ

PSE&G Metering & Regulating Station
New Construction
Pending Verification
Westampton, NJ 08060

PATH - Replacement of Substation No. 2
New Construction
Bidding
$100,000,000 to $110,000,000 est. value
Jersey City, NJ

Washington/Gloucester Reliability Project
New Construction
Design
NJ 08080

Last Updated 10/07/2021 12:33 PM
Project Title

Electric Substation Diagnostic Testing and Maintenance Services

Physical Address View project details and contacts
City, State (County) Park Ridge, NJ   (Bergen County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of these bid specifications is to receive competitive proposals from qualified electrical substation testing and maintenance contractors to provide diagnostic testing and substation maintenance services for the Borough of Park Ridge (Borough) electric department. The Borough is requesting lump sum fixed prices for labor and equipment to perform diagnostic testing, routine maintenance, and minor repairs on the electrical equipment located at the Mill Road Substation and infrared inspection at the Brae Boulevard Substation.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents