Similar Projects
SU Sadler Hall Elevator Modernization 2020
Renovation
Construction
$330,400 est. value
Syracuse, NY 13210

UCH Renovate Nuclear Camera Room
Renovation
Results
Syracuse, NY 13215

4W Office Relocation
Renovation
Results
Syracuse, NY 13215

Construction Manager Term Agreement - South Region
Term Contract
Post-Bid

Construction Manager Term Agreement - North Region
Term Contract
Post-Bid

Emergency Department Psych Renovations Community Campus
Renovation
Results
$300,000 to $700,000 est. value
Syracuse, NY

Victory Court at Syracuse University
Addition
Conception
Syracuse, NY 13210

Schine Student Center
Renovation - 55,000 SF
Design
Syracuse, NY 13204

Renovate Marshall Hall at SUNY ESF
Renovation
Results
$30,000,000 to $35,000,000 est. value
Syracuse, NY 13210

UUH Nuclear Camera Replacement
Renovation
Post-Bid
Syracuse, NY 13210

University Hospital – 5E Sterile Processing Renovation
Renovation
Results
Syracuse, NY 13210

Syracuse University Link Hall Room 019 Laboratory
Renovation, Addition
Construction
Syracuse, NY 13202

Construct Surge Space Illick and Moon at SUNY ESF
Results
$1,000,000 to $2,500,000 est. value
Syracuse, NY 13210

Replace Fire Extinguishing System, Chemical Storage Building
Results
Syracuse, NY 13210

Regional Job Order Contract - Syracuse Region
Renovation
Bidding
$5,000,000 to $10,000,000 est. value
NY

Last Updated 08/04/2020 11:05 AM
Project Title

3N Scope Reprocessing

Physical Address View project details and contacts
City, State (County) Syracuse, NY 13210   (Onondaga County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project provides for the demolition and reconstruction of an approximately four hundred square foot sterile processing suite. The work shall include the removal of all room finishes, the demising wall between the two rooms, re-configuration of the spaces to accommodate the installation of new owner-furnished decontamination, washing and disinfecting equipment including modification of existing mechanical, plumbing, fire protection and electrical systems as required for a completely operational sterile scope processing suite. The work is located on the third floor of an existing operating hospital and is subject to the facility’s policies for infection control, life safety and procedures governing construction related activities. Goal for the Work Force participation: EEO 10% Female Labor Force and 10% Minority Labor Force of total work force on the project.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents