Similar Projects
Sewer Improvements - County of Lake
Infrastructure
Conception
$25,000,000 est. value
Crown Point, IN

Liberty Park Pipe Lining, Crown Point
Infrastructure
Design
$5,000,000 est. value
Crown Point, IN

Drainage Ditch Correction
Alteration
Design
$528,000 est. value
Paoli, IN 47454

Airport Water Main Installation - 2022
Infrastructure
Bidding
$200,000 est. value
West Lafayette, IN

Division 4 - Off-Site Utilities for Water Treatment Plant
Infrastructure
Bidding
$5,769,760 est. value
Danville, IN

Baldwin Street Water Main
Post-Bid
Bargersville, IN 46106

Pool and Spray Park Water Maintenance
Term Contract
Post-Bid
Indianapolis, IN

Jefferson Street Water Main Improvements
Results
Huntington, IN 46750

River Ridge Elevated Water Storage Tanks
Results
Jeffersonville, IN 47130

Drainage Ditch Correction - US 231
Alteration
Design
$3,867,948 est. value
Jasper, IN 47549

Water System Improvements Project
Infrastructure
Bidding
$300,000 est. value
Attica, IN

Water Utility Improvements
Post-Bid
Gaston, IN

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

SR 58 Flood Minimization Project
Infrastructure
Bidding
$500,000 est. value
Bedford, IN 47421

2019 Legacy Core Water Main Replacement
Post-Bid
Whitestown, IN

Last Updated 07/18/2022 08:29 AM
Project Title

Division I - 2022 Water Distribution System Improvements

Physical Address View project details and contacts
City, State (County) Greencastle, IN   (Putnam County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will be constructed as one contract consisting of: construction of a new 12" water main to replace existing water mains along Albin Pond Road, including approximately 5,500 L.F.+ of 12" DI water main, and associated water main connections, valves, fittings, hydrants and service line replacements. This project additionally includes installation of approximately 10 new hydrants, replacement of approximately 9 existing hydrants, and replacement of approximately 12 water valves.The Project consists of: replacement of the existing emergency generator at the Greencastle Water Treatment Facility. Project includes installation of new 800 kw generator set with new service entrance rated automatic transfer switch, along with all associated work for complete installation of new generator and demolition of existing generator.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents