Similar Projects
Preventive and Critical Lining, Phase 2
Infrastructure
Bidding
$1,700,000 to $2,050,000 est. value
Denver, CO

2021 Sanitary Sewer Rehabilitation Program
Post-Bid
Northglenn, CO

SC, SC5B and S. Ouray Way Sanitary Sewer Upgrade Project
Infrastructure
Post-Bid
$4,521,000 to $5,235,000 est. value
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

Public Improvements within Phase 2 of The Point Redevelopment Project
Construction

Box Elder Infrastructure Project Phase I
Infrastructure
Post-Bid
Aurora, CO

District Wide Grease Trap Inspection and Service
Term Contract
Results
Aurora, CO 80015

East 58th Avenue Improvements
Infrastructure
Post-Bid
CO

On-Call Pipeline Construction Services
Term Contract
Results
Brighton, CO

Acoustic Sewer Line Inspection
Infrastructure
Post-Bid
Brighton, CO

H199--Grease Trap and Sand Trap Maintenance - 554
Results
Aurora, CO 80045

2022 SACWSD Wastewater System Rehabilitation
Infrastructure
Post-Bid
Commerce City, CO 80022

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Modules C, D, E, Sanitary Sewer Line Replacement for the Detention Facility
Results
Brighton, CO

Last Updated 04/12/2022 12:33 PM
Project Title

2022 Preventive and Critical Lining, Phase 1

Physical Address View project details and contacts
City, State (County) Denver, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,700,000 to $4,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to rehabilitate approximately 103,000 linear feet of deteriorated sewer pipes in the City and County of Denver using approved Cured-in-Place-Pipe (CIPP) methods. CIPP is a trenchless technology and utilizes existing manholes for installation which allows for significantly shorter construction time in comparison to open trench methods of construction. Since no excavation is required, utilities and traffic conflicts are minimized. The pipes lined in this project are located in City Council Districts 3 and 7.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents