Similar Projects
Whitwell High School HVAC Units Installation
Alteration
Bidding
Whitwell, TN 37397

Air Duct Cleaning Services
Alteration
Bidding
Nashville, TN

COVID-19 Install Air Handling Unit Ultraviolet Lights 626-20-504 and 626A4-20-507 - MATOC
Post-Bid
Murfreesboro, Nashville, TN 37212

HVAC Installation
Post-Bid
Millington, TN 38053

HVAC Maintenance Services for the Jimmy Floyd Family Center
Results
Lebanon, TN 37087

Cooling Tower
Addition
Results
Sevierville, TN 37862

International Center Suite 101 Office Conversions
Renovation
Bidding
Memphis, TN 38111

Heating and Cooling System
Post-Bid
Medon, TN 38356

HVAC Replacements Water Sewer Building
Results
Lebanon, TN 37087

Patriot Academy and Jefferson County High School HVAC Repairs
Alteration
Bidding
$300,000 est. value
Dandridge, TN 37725

Wall-Mounted Heat Pump System with Wireless Remote Controller
Post-Bid
Decatur, TN

Music Mass Comm HVAC Replacement - Phase 2
Results
Clarksville, TN 37044

Packaged Terminal Air Conditioner (PTAC) Units (As Needed)
Term Contract
Bidding
Knoxville, TN

2021 Indoor Air Quality Improvements - Furnishing of Air Purification Equipment
Post-Bid
Greeneville, TN

Community Center HVAC Engineering and Replacement
Results
Mount Pleasant, TN 38474

Last Updated 05/13/2022 07:14 AM
Project Title

Replacement of (10) HVAC Units

Physical Address View project details and contacts
City, State (County) Etowah, TN   (McMinn County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $543,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of replacing 10 HVAC units. Sizes include (2) 15 ton, (2) 20 ton, (1) Stan, (2)7.5 ton, (1) 10 ton, and (2) 12.5 ton. Existing units must be replaced with a high efficiency model, preferably dual fuel. Bidders should include materials, labor, and removal of existing equipment. All electrical work must be NEC compliant, and all work must pass electrical and gas inspections. All work must be done in compliance with the TN Fire Marshal Office, it is the bidder's responsibility to submit required drawings and obtain approval from the fire marshal's office before beginning work and all final work must pass fire marshal's office inspection. Bidders should include replacement of thermostats with Pelican brand control system or equivalent

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents