Similar Projects
Magnolia Drive Phase II Project From Judita Drive To Sunflower Drive - City of Brunswick
Infrastructure
Conception
$1,000,000 CJ est. value
Brunswick, OH 44212

Magnolia Drive Phase II Project From Judita Drive To Sunflower Drive - City of Brunswick
Infrastructure
Conception
$1,000,000 CJ est. value
Brunswick, OH 44212

New High School - Brunswick City Schools
New Construction, Renovation, Infrastructure - 285,000 SF
Design
$109,000,000 CJ est. value
Brunswick, OH 44212

US 42 - Roadway Major Rehab
Infrastructure
Design
$7,701,100 CJ est. value
Medina, OH 44256

2022-2023 Sidewalk Repair Program
Infrastructure
Bidding
$241,000 CJ est. value
Wadsworth, OH 44281

2022-2023 Sidewalk Repair Program
Infrastructure
Bidding
$241,000 CJ est. value
Wadsworth, OH 44281

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Streets and Water Materials and Services
Infrastructure
Post-Bid
Wadsworth, OH

T.H. 357 Valley Brook Boulevard Replacement
Results
$450,729 est. value
Hinckley, OH 44233

Design Build Services for H2ohio Kennard Road Restoration
Infrastructure
Results
$150,000 est. value
Medina, OH

Forest Glen
Infrastructure
Construction
$12,900,000 CJ est. value
Lafayette Township, OH 44256

Forest Glen
Infrastructure
Construction
$12,900,000 CJ est. value
Lafayette Township, OH 44256

Liberty View
New Construction, Infrastructure - 9,100 SF
Pending Verification
$9,300,000 CJ est. value
Medina, OH 44256

Liberty View
New Construction, Infrastructure - 9,100 SF
Pending Verification
$9,300,000 CJ est. value
Medina, OH 44256

Storm Water Improvements at Healey Creek and Lares Lane-Holly Drive - City of Brunswick
Infrastructure
Conception
$250,000 CJ est. value
Brunswick, OH 44212

Last Updated 04/27/2023 04:01 PM
Project Title

2023 Street Striping Project

Physical Address View project details and contacts
City, State (County) Wadsworth, OH 44281   (Medina County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $75,417 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered by the plans and specifications includes furnishing all labor, equipment and the noted material for the installation of pavement markings and street striping at various locations throughout the City of Wadsworth. This improvement must attain Substantial Completion by September 15, 2023. All bidders must be qualified by experience and properly equipped to complete the work specified in the time allotted. Each bid must be submitted on the form provided by the City in the bid book and must be fully completed and submitted intact. Each bid shall contain the entire bid book with all addendums. Each bid must contain the full name of the party or parties submitting it. A bond in substantially the form set forth in section 153.571 of the Ohio Revised Code issued by a surety company or corporation licensed in the State of Ohio to provide said surety. Said bond shall be the full amount of the bid, or b. A certified check, cashier's check or letter of credit pursuant to Chapter1305 of the Ohio Revised Code. The amount of the certified check, cashier's check or letter of credit shall equal 10% of the full amount of the bid and the Successful Bidder will be required to submit a bond in the form provided in section 153.57 of the Ohio Revised Code in conjunction with the execution of the contract. Said bond shall be issued by a surety company or corporation licensed in the State of Ohio to provide said surety No bidder may withdraw a bid within 60 days after the actual date of the opening thereof except as provided in section 9.31 of the Ohio Revised Code The City of Wadsworth reserves the right to reject any and all bids, and to waive irregularities therein. The engineer's estimate for the proposed improvements: Base Bid: $80,000.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents