Similar Projects
Striping Trucks - Electronic Pavement Marking Systems Maintenance and Repair/Statewide
Post-Bid

Asphalt Crack-Sealing
Post-Bid
Lewiston, ME 04240

2019 North River Road Reconstruction Project
Results
Auburn, ME

2019 Fifth Street Reconstruction Project
Results
Less than $510,000 est. value
Auburn, ME

Repair and Pave Roadways, Parking Lots and Sidewalks on the CMCC Campus
Post-Bid
Auburn, ME

2019 Fire Station Driveways Reconstruction Project
Results
Auburn, ME 04210

2020 Reconstruction Project
Post-Bid
Less than $1,250,000 est. value
Auburn, ME 04210

(LCP) Light Capital Paving
Results
Less than $1,200,000 est. value

(LCP) Light Capital Paving and Profile Milling
Results
$2,700,000 est. value

(LCP) Light Capital Paving
Results
Less than $3,400,000 est. value
Andover, Bethel, Buckfield, Gilead, Greenwood, Hebron, Mexico, Minot, Norway, Paris, Peru, Roxbury, Rumford, Stow, Sumner, West Paris, ME

2019 Water Main and Road Rehabilitation - Various Streets
Results
Lewiston, ME

Utility Trench Restoration
Results
Lewiston, ME

Pavement Milling, Hot Mix Asphalt Overlay with Safety Improvements
Results
Mechanic Falls, ME

On Call Maintenance Paving
Results

Bituminous Pavement
Term Contract
Results
Lewiston, ME

Last Updated 02/27/2019 09:11 AM
Project Title

2019 Chestnut Street Construction Project

Physical Address View project details and contacts
City, State (County) Auburn, ME   (Androscoggin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Proposed for the 2019 Chestnut Street Construction Project for the City of Auburn. The scope of work is a brief overview of the expected extent of work on each street included in this contract. This is only a proposed scope with associated estimated quantities. Items, extent and entire streets may be added or deleted as work progresses or to meet the available funding for this work. Chestnut Street Side of PAL Center: 1. Remove pavement at existing parking area. 2. Install slip form concrete curbing. 3. Grade the area with Type A Gravel and pave with 2" of 9.5mm HMA (Hand Pave). 4. Install 5' chain link fence and gate as directed. Westerly Side of PAL Center: 1. Box cut for new parking and connecting aisle from Chestnut Street to Walnut Street. 2. Parking lot & drive entrance build up 12" Type A, 2" 12.5mm HMA, 1" 9.5mm HMA. 3. Aisle build up 15" Type D, 3" Type A, 2" 12.5mm HMA, 1.5" 9.5mm HMA. 4. Sidewalk build up 12" Type A, 2" 9.5mm HMA (hand pave). 5. Remove concrete walkway into westerly entrance of PAL Center (paid under Item 202.20). 6. Install catch basins and 12" SD. Saw cut trench and pave as aisle build up. 7. Item 603.1791 for connection of existing 18" SD to new intersecting catch basins. 8. Stripe parking stalls. 9. Mulch along the backside of the sidewalk. 10. Loam and seed disturbed areas. Chestnut Street: 1. Install speed table and raised crosswalk as directed (hand pave). Allow for water to flow along curbline for the speed table. 2. Install CBs and SD at the raised crosswalk location. 3. Bituminous curbing disturbed during construction shall be reconstructed and paid under Item 609.111. 4. Build a drive entrance at the gravel parking area. 5. Paint crosswalk and raised tables. 6. Stripe center line on Chestnut Street.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents