Similar Projects
Ossining UFSD HVAC Improvements
Bidding
Ossining, NY 10562

Fujitsu HVAC Units
Bidding
NY

Job Order Contracting Services for Region 1 - HVAC
Post-Bid
White Plains, NY 10601

Job Order Contracting Services for Region 2 - HVAC
Post-Bid
White Plains, NY 10601

Library Building Chiller Replacement
Results
Valhalla, NY 10595

Job Order Contract- HVAC Work
Results
$8,500,000 to $11,500,000 est. value
Valhalla, NY 10595

HVAC Maintenance and Repair Service
Bidding
Armonk, NY

Job Order Contracting Services for Region 3 - HVAC
Post-Bid
White Plains, NY 10601

Steam System Upgrades at Michaelian Office Building
Results
$550,000 to $750,000 est. value
White Plains, NY 10601

Installation of Air Handlers for DPW Garage on Fox Island Road
Post-Bid
Port Chester, NY 10573

Facility Wide HVAC Maintenance at WCC
Results
Valhalla, NY 10595

Cacace Justice Center Chiller Plant Replacement (AS)
Post-Bid
Yonkers, NY 10701

HVAC Service for 134 Court Street
Term Contract
Results
White Plains, NY 10601

2020-2025 Central Air Conditioning System Inspections With Preventative Maintenance, Start Up, and/or Repair Services
Term Contract
Post-Bid

HVAC and Refrigeration Work for the 2020/2021 School Year
Results
$193,050 est. value
Briarcliff Manor, NY 10510

Last Updated 02/17/2020 02:43 PM
Project Title

Replacement of Heating Units and Ventilation Fans at Central Maintenance Facility

Physical Address View project details and contacts
City, State (County) Yonkers, NY   (Westchester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $5,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract consists of providing all necessary labor, material and equipment required to replace existing constant volume type heating and ventilating units with new variable air volume type energy recovery units. Replace existing relief air propeller fans and louvers with new. Provide new carbon monoxide, nitrogen dioxide and static pressure sensors with monitoring stations. Upgrade existing BMS system to incorporate all new and existing equipment. Provide all plumbing work as required. Provide all related roof work and structural supports, dunnage and accessories. Provide all required power upgrades, wiring and controls for the new system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents