Similar Projects
Last Updated | 03/16/2022 08:21 AM |
Project Title | Pile Driving Installation for County Bridge No. 228 |
Physical Address | View project details and contacts |
City, State (County) | NY (Sullivan County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor shall furnish the piles with pile protectors attached to each pile. Splices will not be allowed due to the short estimated length. The contractor shall cut each pile to the cut-off elevation shown on the plans. Dynamic pile testing shall be performed on one (1) H-pile in each abutment to determine load capacity and driving criteria. |
||
Details | Bridge, Renovation.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |