Similar Projects
Bearden Middle School Space Upgrade - Knox County
Renovation
Conception
Less than $5,500,000 est. value
Knoxville, TN 37909

STP Asphalt Overlay of Elmore, Street Elmo and Brunswick Roads - 458 - City of Bartlett
Infrastructure
Conception
$3,800,000 CJ est. value
Bartlett, TN 38134

Bottled Blonde / Nashville
New Construction, Infrastructure - 25,000 SF
Design
$20,000,000 CJ est. value
Nashville, TN 37201

Springbrook Tennis Court Resurfacing and Fence Demolition and Reconstruction
Infrastructure
Design
$30,000 CJ est. value
Alcoa, TN 37701

GRSM 149285 / 149368 Great Smoky Mountain National Park
New Construction, Infrastructure, Renovation - 6,875 SF
Bidding
$10,000,000 CJ est. value
Gatlinburg, TN 37738

Peay Park Court Surfacing
Infrastructure
Bidding
$40,000 CJ est. value
Goodlettsville, TN 37072

Gap Creek Dog Park Fencing Project 2022-2023
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Elizabethton, TN 37643

Painting of Mast Arms
Infrastructure
Sub-Bidding
$70,000 CJ est. value
Collierville, TN 38017

Hillwood High School
New Construction - 300,000 SF
Post-Bid
Nashville, TN 37221

High School Gym & Bathroom
Renovation, Addition
Post-Bid
Alamo, TN 38001

Gallatin Training Facility Mass Grading
Results
Gallatin, TN 37066

ADA Accessibility Modifications at Northeast High School
Renovation
Results
Clarksville, TN 37040

Bledsoe Fall Creek Falls Fiber Optic Expansion
Renovation
Construction
Pikeville, TN 37367

RFQ Design - Construct Sleep Disorder and Specialty Clinics Design - Murfreesboro
Addition, Demolition, Infrastructure, Renovation - 18,600 SF
Pending Verification
$20,000,000 CJ est. value
Murfreesboro, TN 37129

Northside High School Redevelopment
New Construction, Infrastructure - 270,000 SF
Pending Verification
$71,900,000 CJ est. value
Memphis, TN 38107

Last Updated 08/11/2022 05:02 AM
Project Title

Upperman High School Expansion

Physical Address View project details and contacts
City, State (County) Baxter, TN 38544   (Putnam County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

No bid may be withdrawn for a period of thirty days (30) after the date set for the opening of bid. Each bid must be accompanied by a Bid Bond for the sum of five percent of the amount bid. The successful bidder will be required to execute an AIA A312 Performance Bond in the amount of One Hundred of the contract price. Bonds must be accompanied by Power of Attorney.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents