Similar Projects
Gwinnett Place Mall Redevelopment - Gwinnett County
Demolition, New Construction, Term Contract, Infrastructure
Conception
$100,000,000 CJ est. value
Duluth, GA 30096

City Farmers Market Expansion
Addition, Infrastructure - 1,570 SF
Conception
Snellville, GA 30039

Rowen Phase 1 Roads and Infrastructure
Infrastructure
Design
$18,000,000 est. value
Dacula, GA

Pickle & Social
Infrastructure
Design
Buford, GA 30519

Button Gwinnett Phase 2 Water Main Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Lawrenceville, GA 30046

Jim Moore Road Water Main Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Dacula, GA 30019

2222 Braselton Highway Demolition
Demolition, Infrastructure
Sub-Bidding
$20,000 CJ est. value
Buford, GA 30519

US-78 Lanier Sewer Pump Station Decommissioning
Demolition
Post-Bid
GA

Facility Maintenance Services - Annual Contract
Term Contract
Post-Bid
GA

Duluth High School - Softball Stadium and Site Preparation
Results
Duluth, GA 30096

Lanier Islands Conference Center - Phase 1 - Site Preparation
Results
Buford, GA

Ariston Retail - Civil Package
New Construction, Infrastructure
Construction
Buford, GA 30519

Sugarloaf Springs
New Construction, Infrastructure
Pending Verification
$22,700,000 CJ est. value
Lawrenceville, GA 30044

Jimmy Carter Boulevard Shell Convenience Store
New Construction, Infrastructure - 6,000 SF
Pending Verification
$1,500,000 CJ est. value
Norcross, GA 30093

Taco Bell / Dacula
New Construction, Infrastructure - 2,159 SF
Conception
$400,000 CJ est. value
Dacula, GA 30019

Last Updated 08/11/2022 10:27 AM
Project Title

Water Production Water Quality Sampling Improvements

Physical Address View project details and contacts
City, State (County) Buford, GA 30518   (Gwinnett County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $636,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 11, 2022 , this project has not yet been awarded. The project is expected to be awarded on September 20, 2022.** The site-visit is to be utilized by contractors and subcontractors to take pictures, measurements, and visual assessment to submit a bid for this project. All bidders are strongly urged to attend. Questions regarding bids should be submitted to Brittany Bryant, Purchasing Associate II at fax 770-822-8728, or email Brittany.Bryant@gwinnettcounty.com no later than 3:00 p.m. local time, June 22, 2022. CONSECUTIVE CALENDAR DAYS FOR COMPLETION: Shoal Creek Filter Plant 270 (sub) / 300 (final) Lanier Filter Plant 430 (sub) / 460 (final)

Details

Division 01 - General Requirements, Quality Assurance, Quality Control.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents