Similar Projects
Mcduffy Park Construction
Renovation
Bidding
Detroit, MI

Roosevelt Park Construction Project
Infrastructure
Bidding
Detroit, MI 49441

Turf Field Construction and Track Reconstruction
Post-Bid
New Boston, MI

Design and Build Aquatic Play Area
Post-Bid
Southgate, MI 48195

Bird Elementary School Paving Expansion and P-CEP JV Track and Field Replacement Project
Results
Plymouth, MI

Practice Football Field Improvements
Results
Dearborn, MI

Park Promenade Development
New Construction - 165,000 SF
Construction
$10,000,000 CJ est. value
Woodhaven, MI 48183

Early Childhood Education Center
New Construction - 58,000 SF
Construction
$15,000,000 est. value
Detroit, MI

City of Melvindale Playground Design and Build Out
Post-Bid
Melvindale, MI 48122

Palmer Park Multi-Sports Hub
Term Contract
Results
Detroit, MI

Playground Equipment Relocations
Post-Bid
Westland, MI 48185

Impact Attenuating Surfacing for Playground Structures
Results
Less than $14,340 est. value
Livonia, MI

Park Drinking Fountains
Post-Bid
Taylor, MI

Bleacher Design, Furnishing And Installation
Results
Detroit, MI

Cobb and Lions Park Playgrounds - Design and Installation
Post-Bid
Southgate, MI 48195

Last Updated 05/18/2021 09:13 AM
Project Title

Milliken State Park - Berm Improvement

Physical Address View project details and contacts
City, State (County) Detroit, MI 48207   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work including but not limited to the following: completion of rough grading, installation of demarcation layer, placement of topsoil, fine grading of the site, maintenance of erosion control measures previously installed by the Owner; addition of new soil erosion measures noted on plans, installation and maintenance of site seeding and slope protection, remediation efforts to clear the existing storm sewer catch basins and storm piping, removal of all erosion control measures, clean-up of site, and preparation and submission of project closeout document

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents