Similar Projects
Range Hood Ventilation Upgrades Project at San Jacinto Leadership Academy
Renovation
Sub-Bidding
$400,000 CJ est. value
San Jacinto, CA 92583

District Services Center Walk-In Freezer
Renovation
Sub-Bidding
$90,000 CJ est. value
Palm Springs, CA 92264

Chiller Inspection, Maintenance, and Repair Services
Term Contract, Alteration
Post-Bid
Riverside, CA 92506

HVAC Upgrades
Alteration
Post-Bid
San Jacinto, CA 92583

Demuth Community Center Egress And Gym Improvements
Renovation, Alteration
Results
$750,000 to $950,000 est. value
Palm Springs, CA 92264

HVAC Repair Services in Riverside and San Bernardino Counties
Term Contract
Results

Heating, Ventilation and Air Conditioning (HVAC) Filters - Pleated Type (Including V-Cell) and Rigid Type
Term Contract
Sub-Bidding
Riverside, CA 92522

HVAC Replacement at Multiple Sites Phase 2
Alteration
Post-Bid
Hemet, CA 92545

City Council Chambers Renovations
Alteration
Results
Palm Desert, CA 92260

HVAC Unit Installation At Cesar Chavez Community Center
Alteration
Post-Bid
$70,000 est. value
Riverside, CA 92522

HVAC Maintenance and Installation Services
Alteration
Results
Palm Springs, CA 92262

March Mountain and Vista Del Lago High School Gymnasium HVAC Upgrades
Renovation
Post-Bid
$410,000 CJ est. value
Moreno Valley, CA 92557

FMD Chiller Maintenance
Alteration
Results
Riverside, CA

Semi-Annual HVAC Maintenance and Repairs for 2022-2023
Alteration
Post-Bid
Desert Hot Springs, CA

San Jacinto High School Welding Shop HVAC Upgrades
Alteration
Results
$400,000 est. value
San Jacinto, CA 92583

Last Updated 01/19/2023 12:02 PM
Project Title

Public Safety Building HVAC Replacement

Physical Address View project details and contacts
City, State (County) Moreno Valley, CA 92553   (Riverside County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A single story public safety building with replacement of two 60 Tons rooftop units, two sets of Liebert units, VAV boxes, as well as upgrade of building EMS Response Types Response File Subcontractor Bid Bond General Attachment Type of Award Lump Sum License Requirements C-20, DIR Registration Bid Valid 180 days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 11/23/2022 2:00 PM (PDT) Contact Info Purchasing Division (951) 413-3190 purchasingdivision@moval.org Scope of Services This RFP is for licensed and qualified Warm-Air Heating, Ventilating and Air Conditioning (C-20) to provide all labor, equipment, materials, and performance of operation in connection with the HVAC replacement project 803 0053 at the City of Moreno Valley's Public Safety Building as described in the detailed scope below. Official plans and specs are available in the documents tab of this RFP. A single story Public Safety Building for City of Moreno Valley. Mechanical scope includes replacement of two existing rooftop AC units with two new 70-ton rooftop AC units, replacement of all VAV boxes at ceiling space as well as upgrade of building EMS with Pelican control. Electrical scope includes removal and replacement of power connection to new units. Structural scope includes seismic modification of existing platform to support new rooftop units. The building requires continuous air conditioning during the construction. Common supply duct loop with manual isolation dampers from rooftop AC units are specified to allow one rooftop AC unit in operation while the other rooftop AC unit is in the process of replacement. Contractor shall coordinate with City of Moreno Valley Public Works for EMS system connections and programming, and provide miscellaneous wiring and terminations as required for a complete and operational system. Contractor shall follow City provided engineered plans for mechanical, electrical, plumbing, and structural trades as indicated in the construction documents. Upon completion of this project, HVAC system will be fully operational and code compliant. o All work to be performed during the hours of 8:00 AM to 5 PM. o Weekend work or after hour work must receive prior authorization by City of Moreno Valley Public Works. o All work to comply with plans and specifications provided. o All work shall conform to all applicable codes. o Contractors must comply with Riverside Sherriff's background check and City's insurance requirements. o Contractor to clean site daily of any debris. o Contractor to demonstrate upon completion, equipment operation. o Site will be notified of work to be performed and the impact that can be expected. o Welding screens, Vapor Barriers, Fire Extinguishers, Tape Barriers, Screens for flying debris, safety data sheet (SDS), and any other safety devices required shall be provided by the contractor and must be used at all times. o Contractor shall be responsible for returning City of Moreno Valley property (inside or out) to original, if not better state on all applicable areas of demo or new work. o Contractor shall be responsible for removal and replacement of any roofing, roof sheathing and ceilings to accommodate the new work. Materials shall match existing and roof warranties shall remain in place. o Any "or equal" submittal must be preapproved by the City of Moreno Valley in writing prior to bid. o Good workmanship is a must; all work will be inspected for compliance with City standards, compliance with construction documents and all applicable codes. All work must be of the highest standard. If you have any questions, please contact City Public Works personnel. o The successful proposer shall perform, with its own organization, Contract Work amounting to at least fifty-one percent (51%) of the Contract Price, except that any designated ""Specialty Items"" may be performed by subcontract and the amount of any such ""Specialty Items"" may be deducted from the Contract Sum before computing the amount of Work required to be performed by the Contractor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents