Similar Projects
Central Wyoming Regional Airport Terminal and Reconstruction of the Airport Road - City of Riverton
New Construction, Infrastructure
Conception
$500,000,000 CJ est. value
Riverton, WY 82501

Waltman to Shoshoni US 20/26 - N342054 - Fremont County
Infrastructure
Conception
$4,270,000 CJ est. value
Shoshoni, WY 82649

Wyoming Life Resource Center and the Wyoming Fire Academy asphalt paving projects
Infrastructure
Bidding
$800,000 CJ est. value
Lander, WY 82520

Riverton Medical Center Community Hospital
Demolition, New Construction, Infrastructure - 7,300 SF
Sub-Bidding
$42,400,000 CJ est. value
Riverton, WY 82501

RIVERTON HOSPITAL
New Construction, Infrastructure - 7,300 SF
Sub-Bidding
$42,000,000 CJ est. value
Riverton, WY 82501

Project Manual for Fremont County Solid Waste Disposal District Scalehouse Construction
New Construction, Infrastructure
Post-Bid
$320,000 CJ est. value
Lander, WY 82520

RIW 053-054 Taxiway A, C1, and D Rehabilitation Rebid
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Riverton, WY 82501

Lander High Pressure Water System Upgrades - Phase III Projects
New Construction, Infrastructure
Results
$9,484,376 CJ est. value
Lander, WY 82520

Arapahoe Water Supply Phase II Transmission Mains - Tank to 17 Mile Project
Infrastructure
Results
$1,105,731 CJ est. value
Arapahoe, WY 82501

Amoretti Street Residentail Development
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Lander, WY 82520

Lander to Sinks Canyon Wyoming 131 - 0701005 - Fremont County
Infrastructure
Conception
$3,291,000 CJ est. value
Lander, WY 82520

Riverton Taco John's Remodel
Addition, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Riverton, WY 82501

West Side Addition Sewer Project
New Construction, Infrastructure
Results
$1,278,348 CJ est. value
Shoshoni, WY 82649

Ethete to Kinnear WY 132
Infrastructure
Conception
$3,000,000 CJ est. value
Ethete, WY 82510

RFP Construction Manager at Risk - Hospital and Clinic With Associated Site Development
New Construction, Infrastructure - 70,000 SF
Post-Bid
$35,000,000 CJ est. value
Riverton, WY 82501

Last Updated 12/27/2023 11:01 AM
Project Title

2024 Wastewater Treatment Plant Improvements Project

Physical Address View project details and contacts
City, State (County) Dubois, WY 82513   (Fremont County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of replacement of the liner and baffle walls within Cell #3. Additionally, the project will consist of the replacement of the outlet structures in both Cells #2 and #3. A Bid Security in the Amount of 5% of the Bid Shall Accompany Each Bid. All Bids Are to Be Prepared in Accordance With the Bidding Documents. Responsible Wyoming Bidders Will Be Given a 5% Preference. Performance and Payment Bonds Will Be Required of the Successful Bidder. Questions Regarding the Bidding Documents Should Be Directed to Matt Bowers, Pe, Nelson Engineering, Mbowers@nelsonengineering.net (Ph: 307-733-2087). The Town of Dubois Reserves the Right to Reject Any and All Bids, and to Waive All Informalities. Further, the Town May Accept Any Bid Which in Its Opinion Best Serves Its Interests.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents