Similar Projects
Construction of ADA Compliant Bus Shelter Pads TAP Project VI
Results
Espanola, NM 87532

APS Westside Bus Depot
New Construction - 26,764 SF
Post-Bid
Albuquerque, NM 87121

Construction of a New and/or Remodeled Administration Building
New Construction, Renovation, Addition - 9,000 SF
Results
$2,850,000 est. value
Nambe, NM 87506

APS Main Bus Depot
New Construction
Post-Bid
Albuquerque, NM

Bus Shelters for Red Apple Transit
New Construction
Results
$152,000 est. value
Farmington, NM

Springer Municipal Airport - Phase II Construction
Results
$319,575 est. value
Springer, NM 87747

Taos Transit Operations and Maintenance Facility
Renovation
Design
Taos, NM

ZEV Bus Charging Station
Results
Albuquerque, NM 87106

SWMD Vehicle Maintenance Building Phase I Edith
Results
Less than $24,150,000 est. value
Albuquerque, NM 87102

Expansion of the Jim West Transit Center
Post-Bid
NM 87532

Construction Services for Electric Vehicle Charging Station
Results
Truth or Consequences, NM

Last Updated 08/05/2021 03:09 PM
Project Title

Multi-Modal Transportation Center EV Charging Stations

Physical Address View project details and contacts
City, State (County) Raton, NM   (Colfax County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall generally consist of design, furnishing and installation of two (2) Commercial Grade Dual Port Pedestal Mount Level II electric vehicle (EV) charging stations with dedicated dual-circuits per charging station and infrastructure to serve four (4) EV parking spaces for public use on City-owned property. Equipment shall be configured for session-based billing functionality with payment options including major credit cards, payable to Raton Public Service Co. at established rates. Equipment shall be owned by the City of Raton without restriction or obligation. Scope of work also includes system start-up and networking as necessary for a complete functional installation and all other appurtenant work included and shown in the Project Documents and Specifications.

Details

Misc. Structures, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents