Similar Projects
Eighth Street Commercial Center
New Construction - 83,804 SF
Conception
$500,000 to $1,000,000 CJ est. value
Stockton, CA 95206

Victoria Hotel
New Construction, Demolition - 69,680 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
San Jose, CA 95126

Angels Landing Mixed Use Master Plan
New Construction
Design
$2,000,000,000 est. value
Los Angeles, CA 90013

Dana Point Surf Lodge
New Construction - 59,274 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Dana Point, CA

Residence Inn by Marriott
New Construction - 68,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Lodi, CA 95240

Y--Correct Critical Safety Hazards and Rehabilitate the Ahwahnee Hotel NHL-Seismic
Renovation
Post-Bid
$10,000,000 est. value
Yosemite National Park, CA

Canoga Park Place Rehabilitation
Renovation
Results
$500,000 est. value
Los Angeles, CA 91304

UCSD Theater District Living & Learning Neighborhood
New Construction - 900,000 SF
Construction
San Diego, CA 92037

AC Hotel by Marriott
New Construction
Construction
Sacramento, CA 95814

Crossroads of the World
Demolition, New Construction, Infrastructure - 285,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Los Angeles, CA 90028

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Boutique Hotel
New Construction - 52,671 SF
Conception
Capitola, CA 95010

Dana House Boutique Hotel
New Construction - 125,049 SF
Design
$10,000,000 CJ est. value
Dana Point, CA 92629

Breakers Hotel - Long Beach
Renovation
Post-Bid
$150,000,000 est. value
Long Beach, CA 90802

Whisky Hotel
New Construction
Construction
Los Angeles, CA 90028

Last Updated 09/16/2022 12:03 PM
Project Title

Rehabilitation of L and M Motel

Physical Address View project details and contacts
City, State (County) Healdsburg, CA 95448   (Sonoma County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,347,326 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work in general consists of of rehabilitation and related construction of L&M Motel, in Healdsburg, California, as indicated in Contract Documents. L&M MOTEL is a Twenty Two (22) Unit existing Motel. Work includes interior and exterior rehabilitation of buildings, accessibility improvements, site improvements, public sidewalk improvements and sewer replacements and other such items of work as are required to complete the Project in accordance with this Contract, the Project Plans and Technical Specifications. In accordance with California Public Contract Code Section 3400, bidders may propose equals of products listed in the technical specifications or project plans by manufacturer name, brand or model number, unless the technical specifications or plans specify that the product is necessary to match others in use. Complete information for products proposed as equals must be submitted to the City Clerk's Office for review at least seven (7) working days before the time specified for bid opening in accordance with the bidders instructions contained in the bid package. For technical questions regarding this project please email the City Housing Administrator, Stephen Sotomayor at ssotomayor@healdsburg.gov In accordance with California Public Contract Code Section 20170, all bids must be presented under sealed cover and include one of the following forms of bidder's security: cash, cashier's check made payable to the City, certified check made payable to the City, or a bidder's bond. The amount of bidder's security provided must equal at least ten (10) percent of the total of the bid price for the base bid and the additive or deductive items listed in this notice. The successful bidder must submit to the City complete, executed copies of all required documents within ten (10) working days of receiving written notice of award of the project. Bidder's security of any successful bidder that fails to do so will be forfeited to the City. Such required documents include, but are not limited to, a payment or labor and materials bond in an amount of at least 100 percent of the amount payable by the terms of the project contract and that satisfies the requirements of California Civil Code Section 9554, and a performance bond in an amount of at least 100 percent of the amount payable by the terms of the contract. All project bonds must be executed by an admitted surety insurer in accordance with applicable law and acceptable to the City. Pursuant to the provisions of Section 1720 et seq. of the Labor Code of California, the Director of Industrial Relations for the State of California has ascertained the current general prevailing rate of wages for employer purposes, in Sonoma County, State of California. Not less than the general prevailing rate of per diem wages for work of a similar character in Sonoma County and not less than the general prevailing rate of per diem wages for holiday work fixed as provided in the California Labor Code must be paid to all workers engaged in performing the project. In accordance with California Public Contract Code Section 22300, except where prohibited by federal regulations or policies, the successful bidder may, on request and at its expense, substitute securities in lieu of amounts withheld by the City from progress payments to ensure performance under the contract in accordance with the contract documents. The City of Healdsburg reserves the right to postpone the date and time for the opening of proposals at any time prior to the date and time announced in the advertisement in accordance with applicable law. The City of Healdsburg reserves the right to reject any and all bids or to waive any defects or irregularity in bidding in accordance with applicable law. In accordance with California Public Contract Code Section 20103.8, if the City elects to award a contract for performance of the project, the contract will be awarded in accordance with California Public Contract Code Section 20162 and other applicable law to the responsible bidder submitting a responsive bid with the lowest total bid price for the base bid without consideration of the bid price for any additive or deductive items. All bids will remain valid for 90 days after the bid opening. Except as permitted by law and subject to all applicable remedies, including forfeiture of bidder's security, bidders may not withdraw their bid during the 90 day period after the bid opening.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents