Similar Projects
Seattle Pacific University Master Plan
New Construction, Renovation
Conception
Seattle, WA 98119

New Facility for Community Transitions
New Construction
Conception
Bellingham, WA

Central Washington University Nicholson Pavilion
Renovation, Addition
Design
Ellensburg, WA 98926

West Point Corrosion Rehabilitation
Renovation
Design
$8,000,000 est. value
WA

Magnuson Health Sciences Center RR-Wing Pediatrics Research Admin Suite Renovation Project
Renovation - 1,860 SF
Bidding
Seattle, WA

MHSC RR-WING Pediatrics Research& Administrative
Renovation, Demolition - 1,860 SF
Bidding
Seattle, WA 98195

PreDesign Services for Student Development Success Center
New Construction
Post-Bid
$260,000 est. value
Bellingham, WA

Friday Harbor Labs Sewer Repair
Renovation, Alteration
Post-Bid
$160,000 to $200,000 est. value
Friday Harbor, WA 98250

Architectural Services for North Academic Complex CWU
New Construction
Results
Ellensburg, WA

SCC Building 19 HEQ Remodel
Renovation
Results
$1,200,000 to $1,400,000 est. value
Spokane, WA

University of Washington Behaviorial Health Teaching Facility
New Construction - 210,000 SF
Construction
$224,000,000 est. value
Seattle, WA 98195

Everett Community College Cascade Learning Resource Center
New Construction
Construction
Everett, WA 98201

Floyd College Of Medicine Renovation
Renovation - 113,770 SF
Conception
$15,000,000 est. value
Spokane, WA 99202

Central Western University North Academic Complex
New Construction, Addition
Design
$50,600,000 est. value
Ellensburg, WA 98926

Spokane Community College Building 8 Remodel
Renovation - 16,000 SF
Post-Bid
$3,500,000 to $4,000,000 est. value
Spokane, WA 99207

Reported 04/14/2022 12:00 AM
Project Title

Upgrade Council Chamber

Physical Address View project details and contacts
City, State (County) College Place, WA   (Walla Walla County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project scope of work is to upgrade the AV, technology, lighting, and finishes within the Council Chamber and Lobby of City Hall; with an additive alternate to replace the City Hall HVAC system.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents