Project Title | Furnishing and Installing Dead End Flushers Assemblies |
Physical Address | View project details and contacts |
City, State (County) | Trenton, NJ 08608 (Mercer County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,107,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ESTIMATE TIME TO COMPLETE THE WORK: 365 calendar days from "Notice to Proceed" LIQUIDATED DAMAGES: $500.00 per day Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 259 253 664 289 Passcode: CoPhn9 Download Teams | Join on the web Or call in (audio only) +1 609-453-2732,,748684367# United States, Atlantic City Phone Conference ID: 748 684 367# Find a local number | Reset PIN QUESTION BY: NOVEMBER 22, 2022, to dpreston@trentonnj.org Bid Opening : Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US Meeting ID: 160 242 9659 Passcode: 094893 Find your local number: https://www.zoomgov.com/u/achfSobfjs The work of this Contract is at various locations throughout the distribution system in the City of Trenton, and the Townships of Ewing, Hamilton, Hopewell, and Lawrence, as well as areas under the jurisdiction of the State of New Jersey and Mercer County within Trenton Water Works' service area. A list of potential work locations is provided in Appendix B of the Specifications. There are a total of 185 dead-end mains that require flusher assemblies, or other infrastructure (i.e. looped mains) to reduce water stagnation A. The Contractor shall furnish all labor, tools, equipment, traffic control devices and incidentals required for the installation of flusher assemblies. The Contractor shall supply all relevant piping, valves, parts, backfill, gravel, asphalt base course, concrete, and materials. B. The Contractor shall be responsible for transport and disposal of materials to and from the project site and shall then provide all materials and parts necessary to complete the flusher assembly installation. C. The Contractor shall complete all other work to properly install flusher assemblies, including but not limited to; all specified special provisions; environmental protection; erosion and sedimentation control; site preparation; rock excavation; removal of concrete road base, trenching, backfilling and compaction; excavation support and protection; decking; furnishing and installing granular fill materials; pipeline cleaning, and flushing; dust control; temporary pavement and road restoration; miscellaneous work and cleanup; and all else incidentals required for successful completion of the work as specified. D. Install flusher assemblies in locations as directed by Trenton Water Works in accordance with the Specifications and details provided in Appendix B. A mark out defining the proposed flusher location will be provided by Trenton Water Works in advance of the work. The Work includes, but is not necessarily limited to, the following: 1. Permit acquisition, as required by the Specifications 2. Locating affected water mains and water services 3. Removal of pavement, sidewalk and grass 4. Tapping of active water main 5. Excavation and Backfilling 6. Dewatering and Shoring 7. Supply of all equipment and materials necessary to perform the flusher assembly installation 8. Installation of flusher assembly 9. Maintaining and recessing steel plates covering excavations 10. Temporary restoration of the local, the County, and/or the State roads and grassed areas, which includes, but is not limited to, sweeping, cleaning, preparing and placing the base course surface; traffic control, traffic signage, and traffic flaggers; including all labor, materials and necessary equipment 11. Testing and disinfection 12. Traffic Control on an as needed basis |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |