Similar Projects
RFQ Design - Expansion of Tech Square, Phase IIIA
Addition, Demolition, Infrastructure
Conception
$800,000 CJ est. value
Atlanta, GA 30334

RFP Design - Construction Professional (CP) Services for Atlanta Unbound Academy, Construction of New K-8 School
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
College Park, GA 30337

The Proctor
New Construction, Infrastructure - 142,000 SF
Design
$55,000,000 CJ est. value
Atlanta, GA 30318

Fire Station 5 Construction
New Construction, Infrastructure - 10,912 SF
Design
$3,000,000 CJ est. value
Sandy Springs, GA 30328

Global Impact Academy - Storm Drainage Improvement
Infrastructure
Bidding
$800,000 CJ est. value
Fairburn, GA 30213

Morgan Falls Connector Phase 2A
Infrastructure
Bidding
$2,000,000 CJ est. value
Sandy Springs, GA 30328

Krispy Kreme / Atlanta
New Construction, Infrastructure - 4,035 SF
Post-Bid
$1,400,000 CJ est. value
Atlanta, GA 30308

RFQ Construction Manager at Risk - Expansion of Tech Square, Phase IIIA
Addition, Demolition, Infrastructure
Post-Bid
$800,000 CJ est. value
Atlanta, GA 30334

CDBG Utility Building And Site Improvements
New Construction
Results
College Park, GA 30337

Unpaved Roads - Phase 1
Infrastructure
Results
$1,890,079 CJ est. value
Atlanta, GA 30334

Happy Faces Academy
New Construction - 6,342 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Alpharetta, GA 30004

Mount Pisgah Christian School - Preschool
Renovation - 7,646 SF
Construction
$1,000,000 est. value
Alpharetta, GA 30022

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Grove Park Microsoft Offices
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Atlanta, GA 30318

Microsoft Data Center / Palmetto
New Construction, Infrastructure, Alteration
Conception
$27,000,000 est. value
Palmetto, GA 30268

Last Updated 08/18/2022 03:03 PM
Project Title

Duluth Highway Daycare Center

Physical Address View project details and contacts
City, State (County) Duluth, GA 30097   (Fulton County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Pre-School/Daycare, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A special use permit was approved by Gwinnett County in October 2019. As of August 18, 2022, no development permits have been submitted to the county for review. Information regarding either an architect or general contractor has not been disclosed. Although there is not a firm timeline, construction is expected to begin in second quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

27,534 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents