Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
Less than $95,000,000 est. value
Camp Lejeune, NC

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Tax Commissioner Parking Lot and New Road
Infrastructure
Post-Bid
Dalton, GA

Southern Region Disaster Recovery Support BPA
Results

2020 Milling and Resurfacing Various City Streets
Results
Less than $996,067 est. value
Dalton, GA 30719

T32-D6-PPV-Murray-Whitifield-108636
Results

Riverbend Park Grading, Drainage, and Paving
Results
Less than $2,145,081 est. value
Dalton, GA 30722

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

T32-D6-PCC-Whitfield-115317
Results
GA

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

2021 LMIG Project
Results
Mount Vernon, GA

Improvement of Hill Road between Eastbrook and Wagner Drive to Airport Road
Results
Dalton, GA 30721

Varnell Elementary School Paving
Results
Dalton, GA 30721

5.8 S Maple Grove Road at SR 71
Results
Dalton, GA 30721

Last Updated 12/07/2021 03:30 PM
Project Title

Reconstruction of Head Road

Physical Address View project details and contacts
City, State (County) GA   (Whitfield County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $318,519
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of reconstructing 270 linear feet of Head Road in unincorporated Whitfield County that has recently failed. The new roadway section will consist of two 10 ft asphalt lanes in each direction with 1 ft grassed shoulders on each side of the roadway and a concrete V-ditch on the south side of the roadway. There is also one 50 ft drainage pipe in the middle of the project with a drop inlet and a flared end section. There is approximately 320 linear feet of bared wire fence that will need to be replaced as part of the project. The geotechnical reports included in the contract also details the required remediation of the failure area that is required prior to final grading for the new roadbed. All grading, subgrade construction and the required erosion control measures will be the responsibility of the contractor. All the final asphalt final paving will be completed by Whitfield County Public Works.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents