Similar Projects
Montessori Radmoor School
Addition - 5,635 SF
Design
Okemos, MI 48864

Sexton High School BP# 1 - Energy Efficiency Project
Renovation
Bidding
$400,000 CJ est. value
Lansing, MI 48915

Lansing School District Phase II Lyons ES 2023 Energy Efficiency Upgrades - Bid Pack 1
Renovation
Bidding
$600,000 CJ est. value
Lansing, MI 48910

2 Elem School Remote/Portable Classrooms
Renovation
Post-Bid

High School Photo Lab Renovations
Renovation
Post-Bid
Okemos, MI

Renovations for Ingham ISD Wilson Talent Center and Heartwood Center Bid Package 2
Renovation
Results
$13,500,000 est. value
MI

Elementary Outdoor Learning Centers & High School Athletic Improvements
Renovation
Results
East Lansing, MI

Building Replacement 1 - 2022 Bond - Lansing School District
New Construction, Infrastructure
Pending Verification
$21,900,000 CJ est. value
Lansing, MI 48933

Sexton Building Improvements - 2022 Bond - Lansing School District
Renovation, Infrastructure
Pending Verification
$11,100,000 CJ est. value
Lansing, MI 48915

Flat Rock Esser Funds 2022 Project
Renovation
Post-Bid

Woodcreek Elementary Improvement BP #2
Renovation
Results
Lansing, MI

Building Replacement 2 - 2022 Bond - Lansing School District
New Construction, Infrastructure
Pending Verification
$21,900,000 CJ est. value
Lansing, MI 48933

2021 Bond Issue Series 1
Renovation
Post-Bid
Holt, MI

Ingham ISD Wilson Talent Center - Bid Package 4
Addition, Renovation, Infrastructure - 6,000 SF
Results
$471,555 CJ est. value
Mason, MI 48854

Air Conditioning and Quality Improvements Package 1 - 2022 Bond - Lansing School District
Infrastructure
Pending Verification
$4,100,000 CJ est. value
Lansing, MI 48933

Last Updated 05/08/2023 11:32 AM
Project Title

Okemos Public Schools 2022 Bond Program Bid Package No. 1 2023 Summer Renovations

Physical Address View project details and contacts
City, State (County) Meridian charter Township, MI 48864   (Ingham County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

All questions are to be directed to the Construction Manager, sent to Alexa Oifer (alexa.oifer@christmanco.com) and Shane Lounsberry (shane.lounsberry@christmanco.com). No direct contact with the Owner or Architect is allowed Prebid RFI's are due by end of day on April 21 st, 2023. No questions will be answered after this date. Each Proposal shall be accompanied by a certified check, cashiers' check, money order, or bidbond made payable to The Christman Company in an amount not less than five percent (5%) of the base bid as a bid security. The Bid Security of Bidders under consideration will bereturnedimmediately after award of contracts by the Construction Manager. The amount of theguarantee shall be forfeited to the Owner if the successful Bidder fails to enter into acontract and furnish required bonds and insurance within 30 days after award of contracts. All proposals submitted shall remain valid for a period of sixty (60) days after the bid date. TheOwner, Architect, and Construction Manager reserve the right to waive any irregularities, reject any or all proposals, or accept any proposal, which, in their opinion, will serve their best interest. Post bid interviews will be scheduled for May 4 th and 5th, 2023. Bidders must haveavailability for an interview during that time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents