Similar Projects
Coonskin Golf Course Irrigation Pump Station
Renovation
Bidding
$200,000 est. value
Big Chimney, WV 25302

Liberty Street Pump Station Structural Rehabilitation and Manhole Lining
Renovation, Infrastructure
Bidding
$600,000 est. value
South Charleston, WV 25309

Biennial Construction and Maintenance Contract
New Construction, Infrastructure
Post-Bid
Charleston, WV

Midway Pump Station Building
New Construction
Post-Bid
Bluefield, WV

Inflow and Infiltration Rehabilitation
New Construction
Results
Charleston, WV

Water System Improvements
New Construction
Results
$9,255,000 est. value
Fairmont, WV 26554

Sewage Pump Station Rehabilitation at Pike Island Locks and Dam
Renovation
Bidding
$100,000 to $250,000 est. value
Wheeling, WV 26003

Alum Creek Lift Station Pump and Control Panel
New Construction
Post-Bid
$300,000 est. value
South Charleston, WV

Gerrardstown Pump Station, Forcemain and Wastewater Treatment Plant Decommission Project
New Construction
Results
Charleston, WV

Lift Station Improvements
New Construction
Results
$1,200,000 est. value
Charleston, WV

11th Street Pump Station Stabilization
Infrastructure
Results
Huntington, WV 25701

Contract IIIG Wastewater Collection and Treatment System Improvements
Alteration
Results
$8,995,000 est. value
Wheeling, WV

Franklin Elementary Sewer Extension
Renovation, Infrastructure
Results
Wellsburg, WV 26070

SAPP's Run and State Route 73 Sewage Lift Station Replacements
New Construction
Results
Fairmont, WV

Wastewater Pump Stations Improvements Project
Renovation
Results
Ansted, WV

Last Updated 07/15/2022 08:27 AM
Project Title

AAA Lift Station Improvements

Physical Address View project details and contacts
City, State (County) New Martinsville, WV 26155   (Wetzel County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $390,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes demolishing the existing lift station building; demolishing the existing lid from the lift station; replacing the existing influent manhole; installing a new duplex submersible pumping system in the existing lift station wet well; replacing piping and valves in the lift station; electrical improvements; and site work, together with necessary appertaining work.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents