Similar Projects
IDIQ Pavement Patching
Results

Albion Street Improvements
Post-Bid
Avilla, IN 46710

2021 Street Improvements
Post-Bid
Rome City, IN 46784

2021 Street Improvements
Post-Bid
Albion, IN

2020 Community Crossing Martin Street
Results
$150,000 to $350,000 est. value
Ligonier, IN

Intersection Improvement
Results
IN

CCMG Street Improvements 2020-2
Results
$104,902 est. value
Kendallville, IN

2021 HMA Overlay
Infrastructure
Results
Less than $680,266 est. value
Albion, IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

2022 HMA Overlay
Infrastructure
Results
$700,000 to $850,000 est. value
IN

2022 Street Paving
Infrastructure
Results
Rome City, IN 46784

Ley Street Improvements
Infrastructure
Results
Avilla, IN 46710

2022 Street Improvements (2021 CCMG Funding) Hazel Street and Liberty Street
Infrastructure
Post-Bid
Albion, IN

CCMG Street Improvements
Infrastructure
Results
$424,089 est. value
Kendallville, IN

2022 Community Crossings Road Improvements
Infrastructure
Results
Ligonier, IN

Reported 06/01/2022 12:00 AM
Project Title

CCMG Street Improvements 2022-1

Physical Address View project details and contacts
City, State (County) Kendallville, IN   (Noble County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $883,910 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project consists of the installation of the approximate quantities of the following materials: 4,275 Lineal feet of concrete curb 3,730 Tons of Hot Mix Asphalt (HMA) Pavement 3,800 Square feet of concrete sidewalk, approaches & ADA ramp repl. 24,480 Square Yards of Asphalt Milling The work to be performed and the proposals to be submitted, included any and all separate and combination proposals, shall include sufficient and proper sums for all General, Construction, Installation, Labor, Materials, Tools, Equipment, Taxes (both Federal and State), Permits, License.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents