Similar Projects
Coral Springs Pre-K - 8 SMART Program
Renovation
Conception
$1,875,193 est. value
Coral Springs, FL 33065

Dania ES SMART Program
Conception
$1,065,000 est. value
Dania Beach, FL 33004

Faith and Life Fellowship Ministries and Alpha International Academy Charter School
New Construction, Renovation, Demolition - 19,443 SF
Design
$3,000,000 est. value
Hollywood, FL 33020

Bethlehem Junior Academy
Renovation - 3,000 SF
Design
Tamarac, FL 33319

Parkside Elementary School - Smart Program Renovations
Renovation
Bidding
$659,112 est. value
Coral Springs, FL 33065

Construction Manager at Risk Services for Robert C Markham Elementary School
Post-Bid
Less than $8,552,850 est. value
Pompano Beach, FL

Maplewood Elementary School - Smart Program Renovations
Renovation
Post-Bid
Less than $1,759,996 est. value
Coral Springs, FL 33071

Smart Program Renovations Panther Run Elementary School
Results
Less than $947,715 est. value
Pembroke Pines, FL 33029

Sunset Lakes Elementary School - SMART Program Renovations
Renovation
Results
Less than $8,003,377 est. value
Miramar, FL

Alazhar School
Addition - 19,785 SF
Construction
$1,711,950 est. value
Tamarac, FL 33068

Eagle Point Elementary School - Smart Program Renovations
Renovation
Construction
Sunrise, FL 33326

Mary M Bethune ES SMART Program
Conception
$2,337,647 est. value
Hollywood, FL 33020

Guidepost Montessori
Renovation - 16,885 SF
Design
Hollywood, FL 33020

Norcrest Elementary School - Smart Program Renovations
Renovation
Post-Bid
Less than $2,360,000 est. value
Pompano Beach, FL 33064

Fox Trail Elementary School - SMART Program Renovations
Renovation
Results
Less than $508,885 est. value
Davie, FL 33324

Reported 03/27/2020 09:33 AM
Project Title

Oakland Park Elementary School - Smart Program Renovations

Physical Address View project details and contacts
City, State (County) Oakland Park, FL 33334   (Broward County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $2,013,071
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Site Work: •Repair of aluminum covered walkways roofs. •Replace 8 exterior pole-mounted lighting fixtures at the parking lots. Building 01 (Administration Building): •Re-roofing •Mechanical: Replacement of 2 AHU's and 1 CU. •Replace the existing Fire Alarm Panel. •Electrical: Replacement of exterior light fixtures. Building 02 (Media Center): •Re-roofing. •Mechanical: Replacement of 1 AHU. •Electrical: Replacement of exterior light fixtures. Building 03 (Classrooms): •Re-roofing. •Mechanical: Replacement of 4 rooftop a.c. units. •Electrical: Replacement of light fixtures located in the covered walkway. Building 04 (Classrooms): •Re-roofing •Mechanical: Test and Balance of the entire Building. Building 05 (Teacher Planning): •Re-roofing Building 06 (Auditorium): •Re-roofing •Repair 2 damaged exterior concrete columns. •Mechanical: Replacement of 2 exterior condensing units and 2 AHU's. •Electrical: Replacement of the electrical panel serving the building. •Electrical: Replacement of light fixtures located in the covered walkway. Building 07 (Building Support): •Re-roofing. •Mechanical: Replacement of 2 HVAC chillers. •Electrical: Replacement of the switch-gear and panel. •Electrical: Replacement of wall mounted exterior light fixture. Building 08 (Classrooms): •Re-roofing. Building 09 (Classrooms): •Re-roofing. •Mechanical: Replacement of 3 AHU's. •Electrical: Replacement of wall-mounted exterior light fixture. Building 10 (Storage): •Re-roofing, including the replacement of the roof deck. •Electrical: Replacement of electrical panel. Building 11 (Cafeteria): •Re-roofing. •Mechanical: Replacement of 1 AHU and 1 package RTU (rooftop unit). •Mechanical: Replace Kitchen hood exhaust and intake •Electrical: Replacement of transformer and switch-gear. •Electrical: Replacement of 2 distribution panels. Building 12 (Storage): Building 13 (Classrooms): •Re-roofing. •Mechanical: Replacement of 2 exterior condensing units and 2 AHU's.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents