Similar Projects
C-EB School Hands Free Faucets and Installation
Results
Eagle Butte, SD 57625

Bid Package BP1-W Plumbing
Alteration
Post-Bid
$100,000 est. value
Kadoka, SD

Plumbing, Domestic Water and Light Commercial Heating Systems Service
Term Contract
Post-Bid
Box Elder, Spearfish, SD 57719

Midco Aquatics Center Filter Replacement
Alteration
Post-Bid
Sioux Falls, SD 57105

Basin 21 Sanitary Sewer Improvements
Infrastructure
Results
$460,537 CJ est. value
Sioux Falls, SD 57104

Plumbing, Domestic Water and Light Commercial Heating Systems Service
Term Contract
Post-Bid
Box Elder, Spearfish, SD 57719

Rosebud Penthouse Mechanical Work - Construction Project
Term Contract
Results
$100,000 to $250,000 est. value
Rosebud, SD

Last Updated 09/26/2022 07:01 PM
Project Title

Wastewater Treatment Facility & North Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Lake Norden, SD 57248   (Hamlin County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $4,800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City of Lake Norden will receive sealed bids for construction of WWTF and North Lift Station Improvements. Project scope will include the following: Bid Schedule 1: Lake Norden WWTF Pond Improvements * Stabilization of dike wall with approximately 18,700 cubic yards of new clay liner and 22,100 tons of riprap for four wastewater treatment lagoons. * Replace 12 valves and 300 square yards of concrete headwalls. * Furnish and install approximately 9,500 lineal feet of new perimeter fence Bid Schedule 2: Lake Norden North Lift Station and Gravity Sewer Improvements * Furnish and install 8 dia. lined, precast submersible lift station with 6 by 10 precast valve vault with pumps, fitting and appurtenances. * Furnish and install electrical equipment for lift station including control panel and enclosures, new electrical feeder to lift station from water treatment plant, and fiber optic communication cable to water treatment plant. * Removal of existing North Lift Station and control panel. * Integration of North Lift Station control into Water Treatment Plant SCADA system * Furnish and install approximately 980 LF of 6- inch dia. PVC forcemain, sanitary manholes, tracer wire, and appurtenances. * Furnish and install approximately 1,100 LF of 18-inch dia. PVC gravity sewer, sanitary manholes, tracer wire, and appurtenances. * Furnish and install approximately 900 LF of 6- inch dia. PVC watermain, valves, tracer wire, and appurtenances. * Replace base elbow guiderail system, pump lifting chains, and piping in the existing Discharge Lift Station. * Paving on Park St. and 5th Ave. including * Approximately 3 blocks of street reconstruction and new surfacing. * Approximately 4,800 SY of Geosynthetic Geogrid. * Approximately 3,000 Tons of Gravel Base Course. * Approximately 850 Tons of Hot Mix Asphalt Pavement. * Approximately 2,100 LF of Concrete Curb & Gutter and miscellaneous concrete surfacing items. *Bid schedules will be awarded individually and Bidders may submit bids for one or both schedules.* Bid Schedule 1: Unit Price Bid Schedule, probable cost $2.4-2.6 million Bid Schedule 2: Unit Price Bid Schedule , probable cost $2-2.2 million The Bidder to whom the contract is awarded will be required to furnish a construction performance bond and a construction payment bond to the Owner in the amount of one hundred percent (100%) of the contract award for each bond, in conformance with the requirements of the Contract Documents. The construction performance bond and construction payment bond shall remain in full force until the completion of the Contract as specified in the General Conditions. All bids must be accompanied by a Bid security. Bid security will take the form of a bid bond in an amount of ten percent (10%) of the Bidder's maximum Bid price or a cashier's or certified check made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid price. The Bid security will be retained by the Owner if the successful bidder refuses or fails to enter into an Agreement within fifteen (15) days after Notice of Award or fails at time of executing the contract to furnish a construction performance bond and construction payment bond guaranteeing the faithful performance of the work. Any contract or contracts awarded under this Advertisement are expected to be funded in part by a loan from the South Dakota State Revolving Loan Fund. Neither the State of South Dakota nor any of its departments, agencies or employees is or will be a party to this Advertisement or any resulting contract. This procurement will be subject to regulations contained in 40 CFR 35.936, 35.938 and 35.939. The successful bidder including any contractors and their subcontractors on the project, must be registered in SAM (System for Award Management). The low responsive bidder must assure compliance with the requirements of Public Law 115-232, Section 889, Prohibition of Certain Telecommunications and Video Surveillance Services or Equipment. Davis-Bacon and related acts provisions apply to this project. All provisions relative to those acts must be met. NONDISCRIMINATION IN EMPLOYMENT (a) Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138 (WBE). The goals and other requirements for Bidders and Contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Womens Business Enterprises (WBE) are explained in the Specifications. The MBE goal for this project is 1% of the total dollar value of the job while the WBE goal is 4% of the total dollar value of the job. (b) Bidders on this work will be required to comply with the President's Executive Orders Nos. 11246 (Equal Employment) as amended, 11518 (Small Business Concerns), and 11625 (MBE) as amended. The requirements for Bidders and Contractors under these orders are explained in the Specifications. (c) The goal for female utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 6.9%. The goal for disadvantaged/minority utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 1.3%. The goals are applicable to the Contractor's aggregate on-site construction workforce whether or not part of that workforce is performing work on a federal and federally assisted contract or subcontract. The low responsive bidder will be required to certify to compliance with the American Iron and Steel provision of the Consolidated Appropriations Act of 2014. This certification form may be found on page AIS-21 of the State Revolving Fund (SRF) General Conditions and must be included in the bid proposal. Please be advised that waivers and exemptions from the American Iron and Steel provision that cite International Trade Agreements DO NOT comply with the Consolidated Appropriations Act of 2014 as it applies to the SRF programs. Claims from suppliers that the American Iron and Steel provision does not apply to certain products based on the International Trade Agreement exemptions of the Consolidated Appropriations Act of 2014 will not be accepted. Payment for all work shall be in cash based on monthly estimates. Bids may not be withdrawn after the time fixed for opening them. The Owner reserves the right to reject any and all bids, and to waive any irregularities therein.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents