Similar Projects
Minor Reconstruction - SR 172-10.86
Infrastructure
Bidding
OH

Canton South Waterline Extension - Phase 2 and Phase 3 Project
Infrastructure
Bidding
$6,419,525 est. value
Canton, OH

Alternative Liner Pipe Material (CIPP)
Term Contract
Post-Bid

Fire Hydrant and Fire Hydrant Repair Parts
Term Contract
Post-Bid
Canton, OH 44708

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Sewer District Project 600
Results
$1,268,211 est. value
Canton, OH

Market Street Water Line Replacement Project
Infrastructure
Bidding
$325,000 est. value
Canal Fulton, OH

Pittsburg/Milton/ Carosel Waterline Replacement
Results
$796,053 est. value
Canton, OH 44702

Moreland Allotment Sanitary Sewer Force Main Installation
Results
Less than $263,714 est. value
Canton, OH 44702

Cherry Street (SR 93) Water Line Replacement
Results
$362,345 est. value
Canal Fulton, OH 44614

Cleveland Avenue NW Water Main Replacement
Results
Less than $2,285,855 est. value
Canton, OH 44702

Water Meter Replacement and Fixed Base Advanced Meter Infrastructure (AMI) System
Results
$1,375,000 est. value
Louisville, OH 44641

12th Street Northwest Water Main Replacement TAG 617
Results
$287,700 est. value
Canton, OH

Lead Water Service Replacement
Results
Alliance, OH

P-606 Waterline Improvements
Results
$948,639 est. value
OH

Last Updated 12/07/2021 09:10 AM
Project Title

Glenwood Street SW Waterline Replacement Phase II Project

Physical Address View project details and contacts
City, State (County) North Canton, OH 44720   (Stark County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Work consists of the replacement of approximately 1,450 linear feet of existing 14-inch cast iron water main along Glenwood Street from Lindy Lane east to Hillcrest Avenue and 660 linear feet on Hillcrest north to the North Canton Middle School with 12-inch ductile iron pipe. The project will also replace 1,300 linear feet of 8-inch cast iron water main with 8-inch DIP on Donner Avenue from Glenwood north to Glendale Street. The project will replace approximately 1,660 linear feet of concrete curb and gutter and lastly mill and resurface each street.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents