Similar Projects
RFP Design - Design and Construction of Mckee Run Control House
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Dover, DE 19904

Puncheon Run Transmission Bypass - Kent County
Infrastructure
Conception
$2,600,000 CJ est. value
Dover, DE 19904

NCALL Office Building
New Construction, Infrastructure - 7,920 SF
Design
$1,500,000 CJ est. value
Dover, DE 19904

Smyrna Farmers Market
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Smyrna, DE 19977

Vocational Skills Training Building at James T. Vaughn Correctional Center
Renovation, Infrastructure
Bidding
$571,800 CJ est. value
Smyrna, DE 19977

Dover Park Recreation Projects Community Building and Spray Pad Improvements
New Construction, Infrastructure - 2,619 SF
Bidding
$800,000 CJ est. value
Dover, DE 19901

Calvary Baptist Church / Dover
New Construction, Infrastructure - 27,000 SF
Post-Bid
$9,000,000 CJ est. value
Dover, DE 19904

Laboratory Expansion - Bid Package 2: Steel, Carpentry, General Work
Addition, Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Smyrna, DE 19977

Milford 2020 Utilities and Street Rehab Project
Infrastructure
Results
Milford, DE 19963

Sod Farm Site Development
Infrastructure
Results
$200,000 est. value
Dover, DE

1165 South DuPont Boulevard Mixed Use Development
New Construction, Infrastructure - 57,600 SF
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

1165 South DuPont Boulevard Mixed Use Development
New Construction, Infrastructure - 57,600 SF
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

Route 13 Forcemain Relocation - South Dover - County of Kent
Infrastructure
Conception
$5,000,000 CJ est. value
Dover, DE 19901

Commerce Way Warehouse/ Modani Dover
New Construction, Infrastructure - 234,000 SF
Design
$25,516,900 CJ est. value
Dover, DE 19904

James T. Vaughn Correctional Center - Various Sidewalk Replacement
Infrastructure
Bidding
$70,000 CJ est. value
Smyrna, DE 19977

Last Updated 02/02/2023 05:05 PM
Project Title

FY23 Street and Alley Program

Physical Address View project details and contacts
City, State (County) Dover, DE 19904   (Kent County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,037,595 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

All vendors must complete the Intent to Bid notice and send it via email to doverwhse@dover.de.us or by fax to (302) 736- 7178 if they intend to submit a bid. Any vendor not returning the form may not receive published addenda. If you have questions concerning this Intent to Bid, they must be made in writing and emailed to me at doverwhse@dover.de.us. All questions must be submitted no later than November 25, 2022. Questions or comments should be directed in writing to: Barry Wolfgang Contract and Procurement Manager City of Dover Procurement Office 710 William Street Dover, Delaware 19904 E-mail address: doverwhse@dover.de.us A bid bond or certified check in the amount equivalent to ten percent (10%) of the proposal amount shall be required with each proposal. Acceptable bid security shall be limited to a bid bond in a form satisfactory to the City underwritten by a company licensed to issue bid bonds in this state or a bank certified check. If a bid does not comply with security requirements, it shall be rejected as being non-responsive. The check or bid bond of the bidder to whom the contract is awarded will be forfeited to the City of Dover as liquidated damages in case the contract and performance bond are not executed within fifteen days after receiving official notification of award. A performance bond shall be required from the successful bidder for a construction contract. Such a bond shall be for the full amount of the contract. If the contractor fails to provide such a bond or a binder within fifteen days of the award of the contract, the award of the contract or the contract shall be void. The bond shall be released by the City of Dover upon successful completion of the contract and upon a detailed inspection of the contracted work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents