Similar Projects
Buie Professional Building
New Construction, Infrastructure - 4,500 SF
Design
$850,000 CJ est. value
Midlothian, TX 76065

1215 Crossing Apartments
New Construction, Infrastructure - 229,800 SF
Design
$10,000,000 CJ est. value
Glenn Heights, TX 75154

Paving Facilities to Serve Prairie Ridge Phase 4
Infrastructure
Post-Bid
TX

Paving Facilities to Serve Prairie Ridge Phase 5
Infrastructure
Post-Bid
TX

Paving and Drainage Improvements for TxDOT Frontage Road
Infrastructure
Results
Midlothian, TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Crossroads Logistics Park Building 4
New Construction, Infrastructure - 306,925 SF
Construction
$16,114,483 CJ est. value
Midlothian, TX 76065

Crossroads Logistics Park Building 4
New Construction, Infrastructure - 306,925 SF
Construction
$16,114,483 CJ est. value
Midlothian, TX 76065

7 Eleven - Ovilla Road / Glenn Heights
New Construction, Infrastructure - 4,088 SF
Pending Verification
$500,000 CJ est. value
Glenn Heights, TX 75154

Snap Clean Car Wash / Midlothian
New Construction, Infrastructure - 5,084 SF
Pending Verification
$1,500,000 CJ est. value
Midlothian, TX 76065

Arbors of Willow Grove Playground and Splashpark
Infrastructure
Design
$187,515 CJ est. value
Waxahachie, TX 75165

Grading Operations to Serve Prairie Ridge Phase 5
Infrastructure
Post-Bid
TX

2021-2022 Annual Asphalt Rehabilitation Program
Term Contract
Results
Midlothian, TX 76065

Crossroads Logistics Park Building 1
New Construction, Infrastructure - 160,775 SF
Construction
$10,114,123 CJ est. value
Midlothian, TX 76065

Timco Logistics Office & Truck Maintenance Building
New Construction, Infrastructure - 32,272 SF
Pending Verification
$6,500,000 CJ est. value
Waxahachie, TX 75167

Last Updated 03/01/2023 10:09 AM
Project Title

Cottonwood by Lennar Homes

Physical Address View project details and contacts
City, State (County) Ferris, TX 75125   (Ellis County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $135,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Preliminary Plat was presented to the Wilmer Planning commission May 2022. Home builder has been identified. Although a firm timeline has yet to be announced, construction is estimated to begin late 2022 to early 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents