Similar Projects
Lake Afton Park - Red Brick West Restroom Replacement
Renovation
Bidding
$386,903 CJ est. value
Goddard, KS 67052

Traffic Calming Improvements North of Leavenworth High School
Infrastructure
Bidding
$1,250,000 CJ est. value
Leavenworth, KS 66048

Chip Seal
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Concordia, KS 66901

Crack Repair
Infrastructure
Sub-Bidding
$4,000,000 CJ est. value
Fort Scott, KS 66701

US-24 and Columbian Road Intersection Improvements
Infrastructure
Post-Bid
$800,000 CJ est. value
Wamego, KS 66547

2022 Fire Damage Repairs at 503 IVY Street
Renovation, Infrastructure
Post-Bid
$60,000 CJ est. value
Fort Scott, KS 66701

2021 Major Concrete
Alteration
Results
Salina, KS

Concrete Repairs
Infrastructure
Results
Topeka, KS

99th Street and Canyon Creek Boulevard Intersection Improvements
Infrastructure
Construction
$474,972 CJ est. value
Lenexa, KS 66227

Mission Road (92 Nd Street to North City Limit) Street Lighting Project
Infrastructure
Construction
$818,341 CJ est. value
Leawood, KS 66209

Surface Recycle and Chip Seal
Infrastructure
Bidding
$500,000 CJ est. value
Wellington, KS 67103

On-Call Concrete and Paving
Term Contract
Post-Bid
Wichita, KS 67202

Mudjacking
Alteration
Results
$3,000,000 est. value
KS

2022/2023 Street Resurfacing Project
Infrastructure
Post-Bid
$8,500,000 CJ est. value
Kansas City, KS 66101

Mudjacking
Alteration
Results
$3,000,000 est. value
KS

Last Updated 09/10/2023 01:31 AM
Project Title

Orchard Lane Culvert Replacement

Physical Address View project details and contacts
City, State (County) Baldwin City, KS 66006   (Douglas County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $100,654 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of culvert improvements on Orchard Lane, South of High Street, to replace an existing metal culvert with a proposed 5'x4' precast RCB culvert while maintaining local access to the property south of the project via a temporary gravel shoo-fly in Baldwin City. The Project includes, but is not limited to the following approximate major quantities of work: Base Bid Item Description Quantity Units Temporary Shoo-Fly with Drainage Pipes 1 Lump Sum 5'x4'x46' Precast RCB with Wingwalls 1 Lump Sum Handrail on Hubguards and Wingwalls 1 Lump Sum Entrance Pipe (12")(ACSP, PEP, or RCP) 65 Lin. Ft. Pavement Replacement 62 Sq. Yds. Submission of questions should be directed to the owner via email to: Jason Hoskinson, BG Consultants, Inc. 785-840-7299 jason.hoskinson@bgcons.com

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents