Similar Projects
Job Order Contracting Services
Term Contract
Results
Less than $226,000 est. value
Flagstaff, AZ

Design & Construction Of Airport Owned Fueling Stations
New Construction
Results
Mesa, AZ 85201

Entrada Mixed-Use
New Construction
Pending Verification
Avondale, AZ 85353

Airfield Sunshade Fabric Replacement
Results
Tucson, AZ 85706

Yuma Airport Baggage Carousel Replacement
Results
$200,000 to $300,000 est. value
Yuma, AZ 85365

Airport Business Center Stair Modifications
Results
$45,000 est. value
Scottsdale, AZ 85260

36 NPL Windmills for Preventive Maint.
Post-Bid
Pinon, AZ 86510

Echopark Automotive
New Construction - 20,852 SF
Design
Avondale, AZ 85323

Bus Shelter Maintenance and Repair Services
Term Contract
Results
$420,460 est. value
Mesa, AZ 85211

Surf Thru Express Car Wash
New Construction - 14,801 SF
Post-Bid
$1,900,000 est. value
Lake Havasu City, AZ 86403

Last Updated 12/22/2020 01:32 PM
Project Title

Cableway Removal Yuma 2020

Physical Address View project details and contacts
City, State (County) Yuma, AZ 85364   (Yuma County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This statement of work (SOW) describes the requirements for contractor support to the USGS for the removal of the cableway. The main objective of the project is to remove the main cable, messenger cable, cable support towers, concrete footings, and fence enclosures. Scope of Work: Situated on each bank of the river are fenced enclosures containing cable attachment points and support structures. The right bank enclosure is located in the Colorado River Heritage Greenway Park and the left bank enclosure is located in Mohave County Davis Camp Park. The components of the terminations at each bank include cable support towers and mass anchors. The cable supports are anchored to the concrete footing with anchor bolts. The cable supports include steel saddle blocks for support of the main cable, backstay cables to support the towers, and messenger cable support terminations. The cable support at the right bank includes a platform for access to the cablecar, situated on the main cable, used for ferrying personnel across the river. All steel components are to be dismantled and removed from the site, while the cable support tower footers are to be demoed below the existing land surface and covered with topsoil. The mass anchors are to remain in place with topsoil added to fill immediate surroundings to existing land surface elevation.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Cable Transportation, Cable Car Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents