Similar Projects
Groundwater Ultraviolet Disinfection Facility - 09-RWS-19 - City of Casper
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
Casper, WY 82601

N. Poplar Street Storm Sewer Improvements - Phase 1 - 18-Storm-02 - City of Casper
Infrastructure
Conception
$866,000 CJ est. value
Casper, WY 82601

Casper Mountain Trail Center
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Casper, WY 82601

CPR 070 Rehabilitate Runway 8-26
Infrastructure
Bidding
$2,000,000 CJ est. value
Casper, WY 82604

Memorial Way Paving Project
Infrastructure
Bidding
$465,000 CJ est. value
Evansville, WY 82636

Parking Lot Improvements Tennis Complex
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Casper, WY 82601

Installation of New Parking Lot Lighting and Enhancement of Current Building Lighting; Air Traffic Control Tower
Infrastructure
Post-Bid
$60,000 CJ est. value
Casper, WY 82604

Storm Drain Project
Infrastructure
Post-Bid
$30,000 CJ est. value
Casper, WY 82601

Paradise Valley to Robertson Road Trail
Infrastructure
Results
$2,246,256 CJ est. value
Casper, WY 82601

Casper Regional Landfill Cell 5 Construction - Earthwork
Infrastructure
Results
$500,000 est. value
Evansville, WY 82636

Natrona County School District Tennis Complex - Early Bid Packages
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Casper, WY 82601

Natrona County School District Tennis Courts Complex
New Construction, Renovation, Infrastructure
Construction
$3,750,000 CJ est. value
Casper, WY 82601

Dinosolar Solar Energy System
Infrastructure
Pending Verification
$266,617,340 CJ est. value
Casper, WY 82604

Mountain Acres
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Casper, WY 82601

Washington Field Lights Replacement - 1019021003 - City of Casper
Infrastructure
Conception
$346,000 CJ est. value
Casper, WY 82601

Last Updated 02/09/2023 05:12 PM
Project Title

Casper City Hall Project S.A.F.E. Building Remodel

Physical Address View project details and contacts
City, State (County) Casper, WY 82601   (Natrona County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $4,250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 09th, 2023, the project has not been readvertised at the moment, and there is no timeline as to when it will. No current information was stated about the project for the time being. https://www.mdjonline.com/tribune/regional/renovations-proposed-for-casper-ice-area-city-hall/article_ddd23f0c-cc17-5632-9c80-06e329dd286a.html Dec. 10 Major changes to Casper Ice Arena and city hall could be coming soon. The ice arena, built the '80s, serves as home base for Casper's ice hockey community. The parks department believes it to be the only rink open in Wyoming during the summer months, Parks, Recreation and Public Facilities Director Zulima Lopez said in a Dec. 6 memo to the City Manager's Office. But it's operating at a ... _________________________________________________________ As of August 15, 2022, the bids were over budget. The owner plans to have the project redesigned and rebid at a later date. The renovation of an existing two-story building (no basement) of approximately 35,000 total square feet including a small addition. The existing building is constructed of C.M.U. bearing walls, spread footings, slab-on-grade first floor, pre-cast twin-tee concrete second floor, and steel joist roof framing and decking constructed in 1977. Est. Value: $ 4,250,000.00 Est. Completion Date: May 15, 2023 Project Identification: 20033. The renovation of an existing two-story building (no basement) of approximately 35,000 total square feet including a small addition. The existing building is constructed of C.M.U. bearing walls, spread footings, slab-on-grade first floor, pre-cast twin-tee concrete second floor, and steel joist roof framing and decking constructed in 1977. Alternate bids include a post-and beam, stick framed single-story building addition of approximately 1,800 square feet; several interior finish alternates; and an HVAC alternate. The work includes security, aesthetic, functional, and energy efficiency upgrades to the building in the form of: miscellaneous demolition, excavation, backfill, paving, cast-in-place concrete, steel framing, steel decking, steel studs, brick masonry, wood doors, hollow metal and aluminum frames, rigid and batt insulation, single ply roofing, metal flashings, aluminum storefront windows and doors, custom interior and exterior signage, painting, gypsum board, plastic laminate casework, solid surfacing, ceramic floor and wall tile, terrazzo flooring, carpet, rubber base, toilet partitions and restroom accessories, furnishings, plumbing and plumbing fixtures, HVAC units, electrical wiring and light fixtures, fire protection system modifications, exterior concrete flatwork, landscaping, and other miscellaneous items.

Details

,, 70,000 SF - 35,000 SF. 2 Stories Above Grade, 35,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents