Similar Projects
Rose Creek Subdivision
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Fruita, CO 81521

River Trail Expansion - City of Grand Junction
Infrastructure
Conception
$1,700,000 CJ est. value
Grand Junction, CO 81501

Nannie Blaine Solar Park
Infrastructure
Design
$50,000,000 CJ est. value
Grand Junction, CO 81504

F 1/2 Parkway Market to Patterson - City of Grand Junction
Infrastructure
Design
$9,000,000 CJ est. value
Grand Junction, CO 81505

Persigo Waste Water Treatment Plant Expansion - Phase 1
Addition, Demolition, Infrastructure
Bidding
$600,000 CJ est. value
Grand Junction, CO 81505

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Design/Build Lincoln Park Pickleball Courts and Canyon View Park Tennis Courts
New Construction
Results
Grand Junction, CO 81501

2022 Chip Seal Pavement
Infrastructure
Results
CO

The Junction Apartments / Old City Market Redevelopment
Demolition, New Construction, Infrastructure - 200,980 SF
Construction
$60,000,000 CJ est. value
Grand Junction, CO 81501

The Junction Apartments / Old City Market Redevelopment
Demolition, New Construction, Infrastructure - 200,980 SF
Construction
$60,000,000 CJ est. value
Grand Junction, CO 81501

The Magnus Court Subdivision
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Grand Junction, CO 81507

Two Rivers Convention and Events Center
Addition, New Construction, Build-out, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Grand Junction, CO 81501

Riverfront Trail Widening at Broadway and Colorado River - City of Grand Junction
Infrastructure
Conception
$400,000 CJ est. value
Grand Junction, CO 81501

Copper Creek Apartment Community
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Fruita, CO 81521

Last Updated 10/18/2023 08:38 AM
Project Title

Reed Park Improvements

Physical Address View project details and contacts
City, State (County) Fruita, CO 81521   (Mesa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,550,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000330471 This project consists of the removal and modification of existing concrete, asphalt and park facilities and the installation of new recreation & pedestrian improvements, utilities and pavement, a skate/wheel park and shelter/restroom facilities. Work includes, but is not limited to, installation and maintenance of traffic control and storm drain inlet protection, removal of existing asphalt, concrete, underground utilities, an existing restroom structure and existing landscaping and trees; procurement and installation of concrete drain pan, curb, gutter and sidewalk, concrete pavement, asphalt pavement, sewer, water, irrigation and drainage utilities, a storm-water pump system, rest room and shelter foundations and structures, playground facilities, wheel/skate park concrete and features, including related excavation, and trees/landscaping as shown on construction plans. Question Acceptance Deadline 10/11/2023 at 12:00 PM MT Questions are submitted online No -- All questions requiring a response prior to the bid opening shall be submitted in writing (email is acceptable) General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 2.5 % - Payment Bond 2.5 % -Substantial Completion (Except Wheel Park) June 1st, 2024 -Project Completed (Final Acceptance) (Except Wheel Park) June 15th, 2024 pn-6961 Reed Park is an 3.19 acre existing community park in Fruita, Colorado, with existing vehicular access of of S. Elm Street and S. Maple Street, as illustrated. The proposed work scope reflects a comprehensive re-design of the existing community park located at the corner of S. Maple Street and S. McCune Avenue. The Construction Document package includes landscape architecture, civil engineering, mechanical engineering, electrical engineering and skate park design The work contained within these documents consists of the primary elements listed below: 1. Establish required tree protections. 2. Provide site demolition of select site features. 3. Provide earthwork, site grading and site utilities. 4. Provide concrete paving. 5. Provide planting soils and plants. 6. Provide site furnishings and shade structures. 7. Provide wheel park design improvements. 8. Provide mechanical and electrical engineering. 9. Coordinate all work with associated disciplines and trades. Design and Engineering requirements for the following are provided under separate cover by consultants retained by the Owner (City of Fruita): 10. Proposed playground equipment - refer to Playground Designer's Drawings and Specifications. 11. Proposed mini-pitch sport court - refer to Musco's Drawings and Specifications. Irrigation system design and engineering shall be designed and installed by the Landscape Contractor. Refer to General Notes herein and Specs Section 328433 for additional requirements. Addendum #1-#4 have been issued as of 10-16-2023.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents