Similar Projects
Roofing Envelope Services
Post-Bid

Harvard Avenue Maintenance Facility Roof Replacement
Post-Bid
Less than $5,200,000 est. value
Cleveland, OH 44115

West 30th Substation #9 Roof Replacement
Results
Less than $84,845 est. value
Cleveland, OH 44113

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roofing Repair and Maintenance
Post-Bid

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Capital Maintenance and Repair of City Facilities Roofing
Alteration
Post-Bid
Cleveland, OH

Lakeview Terrace Roof Replacement
Results
Cleveland, OH 44104

EFSO Garage Roof Replacement
Alteration
Post-Bid
Cleveland, OH

Roof Replacement at Fairway Manor
Results
Cleveland, OH 44104

Cleveland Public Auditorium Music Hall Roof Replacement
Results
$933,499 est. value
Cleveland, OH 44114

Canterbury Elementary School Roof Sections B, O and L
Results
Less than $63,000 est. value
University Heights, OH 44118

Heights High School / Roof Sections I and M
Results
Less than $87,350 est. value
University Heights, OH 44118

Monticello Middle School / Roof Section F
Results
Less than $75,000 est. value
Shaker Heights, OH 44118

Noble Elementary School / Roof Section A
Results
Less than $120,400 est. value
University Heights, OH 44118

Last Updated 09/03/2021 08:37 AM
Project Title

Manakiki Clubhouse Shake Roof Replacement

Physical Address View project details and contacts
City, State (County) Cleveland, OH   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Tear-off of existing wood shakes and all associated flashings and underlayment down to existing wood sheathing, inspect entire roof deck areas for damaged or decaying wood, any wood identified as damaged or decaying shall be replaced following written approval of Cleveland Metroparks Project Manager, install new galvanized drip edge, install new valley flashing, install ice and watershield up 6’ on all eve edges and in all valleys, install Titanium synthetic underlayment over entire roof deck, install selected roof system per contract, install new box vents (8”x8”) in existing box vent locations, install pipe boot flashings on all pipes, install custom galvanized flashings on all vertical intersections. In addition, contractor shall provide and maintain protective cover over all exterior landscaping and all structures on or around area of work, provide and maintain an 8’ wide x 13’ long protective walkway out from building at main building entry and pro shop entry. Contractor shall remove all roofing debris from property at the completion of the project, or as needed throughout the scheduled work. Project site cleanup shall be completed daily and as needed to provide a safe public environment throughout the project.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents