Similar Projects
Rehabilitate 5th Floor - HVAC Work
Renovation
Sub-Bidding
$100,000 CJ est. value
Albany, NY 12207

Kitchen Hood Cleaning
Term Contract
Sub-Bidding
Albany, NY 12207

Heating Unit Replacement
Alteration
Post-Bid
Albany, NY 12206

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

J041--528A8-19-807 Replace Cooling Towers 1 & 2
Results
$1,000,000 to $5,000,000 est. value
Albany, NY

H141--HVAC Maintenance & Repair Services
Results
Albany, NY

Heating Unit Replacement
Alteration
Post-Bid
$6,500 est. value
Albany, NY 12205

J041--HVAC Controls & BAS Full Maintenance & Repair Services
Results
Albany, NY

Job Order Contracting - Area 4 - HVAC
Alteration
Post-Bid
$500,000 to $1,000,000 est. value
Albany, NY 12210

SFE 061 - Building 1 Fan Coil Replacement
Alteration
Results
Less than $50,000 est. value
Schenectady, NY 12304

Construction Management for Federal Stimulus Fund Supported HVAC and Window Repair
Term Contract, Alteration
Post-Bid
Albany, NY

Replace Expansion Joints, East and West Arterial Roadways - HVAC
Alteration
Results
$500,000 to $1,000,000 est. value
Albany, NY 12242

HVAC Preventative Maintenance and Emergency Service
Term Contract
Post-Bid
Albany, Clarksville, Medusa, Voorheesville, NY 12207

HVAC Improvement Project
Alteration
Results
Albany, NY 12210

HVAC Preventative Maintenance
Alteration
Post-Bid
Albany, NY

Last Updated 01/11/2023 12:07 PM
Project Title

East Berne Fire Station - HVAC

Physical Address View project details and contacts
City, State (County) East Berne, NY 12059   (Albany County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: Includes all labor, tools, materials, and equipment necessary to furnish and install all of the site work and structure associated with the new fire station which includes but is not limited to the following: Subgrade preparation, excavation, and backfilling. Oil/Water Separator, septic system, septic tank Concrete footings, interior slab on grade, exterior slabs on grade, trench drains, and drain piping. Building structure, framing, siding, roofing, insulation systems, liner panel, flashings, trim, gutters, windows, overhead doors with operators, and entry doors. Interior partition framing, joists, sheeting, gypsum board, doors, windows, frames, hardware, trim, wall finishing and painting. As of November 28, 2022, a general contractor has not yet been assigned for this project. A firm construction timeline for this project has not yet been released.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents