Similar Projects
Heat Pump Installation
Post-Bid
South Portland, ME

HVAC Construction
Post-Bid
Portland, ME

SJC HVAC Upgrades at the Cumberland County Courthouse
Results
Less than $200,000 est. value
Portland, ME 04101

Stateside Air Handler Replacement
Results
Portland, ME

Replacement Of Two 1.5 Ton Heat Pumps Systems
Post-Bid
Cape Elizabeth, ME

As Needed HVAC/Mechanical Services
Results
Portland, ME

Weatherization Assistance Program
Term Contract
Post-Bid
ME

HVAC and Plumbing/Preventive Maintenance and Emergency Repair
Results
Bangor, ME

Coffin Elementary Ventilation Improvements and Roof Reinforcement
Alteration
Post-Bid
$235,000 est. value
Brunswick, ME 04011

PWD East End 3rd Floor Admin and Lab HVAC Upgrades
Results
Portland, ME 04101

HVAC Contract Services
Alteration
Post-Bid
Brunswick, ME

Deering High School Gym and Locker Rooms HVAC Renovation
Results
$528,000 est. value
Portland, ME 04103

Gignoux Courthouse HVAC and Fire Alarm Replacement - CMC Sources Sought Services
Term Contract
Post-Bid
Portland, ME 04101

Deering High School Main Office HVAC Renovations
Alteration
Results
Portland, ME 04103

Installation of Heat Pump Systems
Alteration
Post-Bid
Portland, ME

Last Updated 02/10/2022 09:02 AM
Project Title

Talbot Elementary School - Chiller Replacement

Physical Address View project details and contacts
City, State (County) Portland, ME 04103   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing 40 ton chiller system is at the end of its useful life and is need of replacement. The existing system serves three areas at Talbot School: the public library, the administrative offices, and the cafeteria. Provide complete equipment, materials, labor, installation and startup for Chiller Replacements. Demo existing chiller plant and associated components. Provide a new 80-ton packaged rooftop chiller that will serve the gym and south classrooms in addition to the public library, administrative ofices, and cafeteria. The project will also include but is not limited to replacing air handling unit 6 (Gym), new cooling coils, new chilled water piping, new pumps, new integrated controls, and new ductwork and piping insulation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents