Similar Projects
Celebration Village
New Construction
Conception
Newnan, GA

The Willows
New Construction - 4,000 SF
Conception
$500,000 to $1,000,000 CJ est. value
Marietta, GA

Wisteria Ridge
New Construction - 1,190,000 SF
Design
$11,000,000 est. value
Watkinsville, GA 30677

South Point Apartments
New Construction
Design
McDonough, GA 30252

The Macomber Ball Field Improvements
New Construction
Bidding
Statesboro, GA 30459

CP-Athletics
New Construction
Bidding
GA

Rome Middle School Weight Room Addition
Addition - 1,275 SF
Post-Bid
Less than $250,000 est. value
Rome, GA 30161

Halcyon Garden District - Phase II - Trail Head
New Construction - 4,904 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Alpharetta, GA 30005

Construction of a New Gymnastics Facility
New Construction - 20,500 SF
Results
Less than $3,329,000 est. value
Carrollton, GA

General Contractor Services for South Commons Softball Complex Improvements
Results
Less than $2,990,010 est. value
Columbus, GA 31901

Athletic Field
New Construction
Construction
Augusta, GA

352 University Avenue Redevelopment
Renovation, Addition - 62,000 SF
Construction
$8,886,263 est. value
Atlanta, GA 30310

1100 Beaver Ruin Road
New Construction
Pending Verification
Norcross, GA 30093

Prominence Point Parkway Apartments
New Construction
Pending Verification
Canton, GA 30114

Highlands
New Construction - 145,019 SF
Conception
$10,000,000 CJ est. value
Braselton, GA

Last Updated 04/09/2021 09:21 AM
Project Title

Construction of the South Walton Community Center

Physical Address View project details and contacts
City, State (County) Social Circle, GA 30025   (Walton County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility, Clubhouse/Social Club
Contracting Method
Project Status Construction Commenced September 2020, Construction Completion Expected July 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $4,316,385
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes construction of all site work, utilities, and construction of a Community Center/Gymnasium.

Details

1 Athletic Facility, 1 Story Above Grade, to 21,474 SF New Construction Building, 2.98 Acres.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents