Similar Projects
Well 15 Replacement/ Replace Vertical Turbine Pump Assembly
Term Contract
Design
Indian Head, MD 20640

Phase 7 Well Construction
Infrastructure
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD 21409

Phase 7 Well Construction (Wells-To-2022)
Alteration
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Boonsboro High Irrigation Well(s)
Results
Boonsboro, MD 21713

Demolition Services
Demolition
Results
Riverdale, MD 20737

Grinder Pump Replacement Services
Alteration
Bidding
California, MD

Apartment Building Demolition
Post-Bid
Largo, MD

Pump, Motor and Mechanical Equipment Maintenance Services
Term Contract
Results
Bel Air, MD 21014

Parole SPS Pump Retrieval Modification
Alteration
Bidding
$500,000 to $1,000,000 est. value
Annapolis, MD

University of Maryland College Park Site Improvements at Ellicott Hall
Post-Bid
College Park, MD 20740

Fill In and Cap Hand Dug Wells, Newtowne Neck State Park, St. Mary`S County, MD
Results
Less than $50,000 est. value
Leonardtown, MD 20650

North Beach Flood Pump/Equipment Project - 5th Street
Alteration
Bidding
$400,000 est. value
North Beach, MD 20714

Miscellaneous Site Work and Bulk Demolition Job Order Contract
Term Contract, Infrastructure
Post-Bid
Salisbury, MD

Reported 05/11/2022 12:00 AM
Project Title

Demolition Septic Tank and Install New Grinder Pump

Physical Address View project details and contacts
City, State (County) White Marsh, MD 21162   (Baltimore County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Demolition, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents