Similar Projects
Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Mountain Dell Outlet Rehabilitation - Control Valves Pre-Purchase
Post-Bid
Salt Lake City, UT 84115

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Arnold Springs Improvements Project
Results
Less than $256,561 est. value
Herriman, UT 84096

Conductor Pipe for Stratigraphic Well
Post-Bid
Salt Lake City, UT

Zone 1W Tank Transmission Main
Results
Bluffdale, UT 84065

4100 South Secondary Waterline Project
Post-Bid
Magna, UT 84044

Woodland 2020 Water System Overhaul
Results
Less than $3,600,000 est. value
Midvale, UT

Little Cottonwood Penstock Lining Repair
Post-Bid
Murray, UT 84107

2020 Oak Vista Waterline and PRV Replacement Project
Results
Draper, UT 84020

Secondary Water Meter Installation
Post-Bid
South Jordan, UT 84095

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

River Bottom Improvement Project Prequalification
Post-Bid

19C 2200 West Waterline Project
Results
West Valley City, UT 84119

21A: Large Meter Replacements
Post-Bid
West Valley City, UT

Reported 07/31/2021 12:00 AM
Project Title

Upper Conduit Repair - Construction Phase 1

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $1,287,262
Plans Available from Engineer - 07/16/21
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for the Upper Conduit Repair Project includes the following elements: 1. Phase 1 – Rehabilitation of approximately 1,600 lineal feet of 48-inch Concrete Cylinder Pipe with 42-inch HDPE pipe via slip lining, grout of the annular space between the new pipe and host pipe, connection to existing pipe at project termination(s), and appurtenant work. 2. Phase 2 – rehabilitation of approximately 2,200 lineal feet of 48-inch Concrete Cylinder Pipe via: Tight fit HDPE, or slip line HDPE. 3. Phase 3 – rehabilitation of approximately 1,200 lineal feet of 48-inch Concrete Cylinder Pipe via: CFRP, CIPP, or slip line HDPE. 4. Phase 4 – rehabilitation of approximately 1,700 lineal feet of 48-inch Concrete Cylinder Pipe via: Tight fit HDPE, slip line HDPE. All Phases also include the following appurtenant work elements: 1. Construction of vault and yard piping improvements, and connections to existing piping. 2. Excavation to construct the new manway/control vaults; backfill and grading; access road and site improvements. 3. Construction of instrumentation and controls. 4. Site landscape restoration.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents