Similar Projects
The Flaming Gorge Project
New Construction, Infrastructure
Design
$1,000,000,000 CJ est. value
Greeley, CO 80631

The Flaming Gorge Project
New Construction, Infrastructure
Design
$1,000,000,000 CJ est. value
Greeley, CO 80631

RFP Construction Manager - Central Wastewater Treatment Plant Expansion - CMAR Design Phase Services
Infrastructure
Bidding
$300,000 CJ est. value
Johnstown, CO 80534

Chase Building Parking Lot Resurfacing, 827 7 th Street
Infrastructure
Bidding
$300,000 CJ est. value
Greeley, CO 80631

Orchard and Greenwood Plaza Boulevard Intersection Improvements
Post-Bid
Greeley, CO 80112

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Snow Services, Co130 Windsor Colorado
Results
Windsor, CO 80550

Fossil Creek Ranch - Filing 1 & 2
Construction
Windsor, CO

Mead Public Works Maintenance Facility
New Construction - 12,000 SF
Construction
Mead, CO 80542

Greeley Apartment / HP Site
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Greeley, CO 80634

2022 Bond - Weld RE-4 School District
New Construction, Renovation, Infrastructure
Pending Verification
$271,000,000 CJ est. value
Greeley, CO 80631

Campus Improvements Michener Library Trash Enclosure
Infrastructure
Bidding
$75,000 CJ est. value
Greeley, CO 80631

State Highway 60 Waterline Replacements
Post-Bid
Johnstown, CO

12 Inch Waterline Install and Bore Project
Results
CO

Last Updated 09/14/2022 12:39 AM
Project Title

Improve the Safety and Operational Efficiency of the Intersection

Physical Address View project details and contacts
City, State (County) Longmont, CO 80504   (Weld County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Civil Engineer - 08/11/22
Owner View project details and contacts
Architect View project details and contacts
Description

Region: 4 Counties: Boulder, Denver This project will improve the safety and operational efficiency of the US287/SH52 intersection. SH52 will be widened on the north and south sides to accommodate an additional left turn lane and create a 6-foot bicycle lane for both eastbound and westbound traffic. US287 will be widened to the east to accommodate an additional left turn lane for both northbound and southbound traffic. Radii at all four corners shall be increased to improve traffic movements. Traffic signal poles, pedestrian poles and ADA ramps shall be replaced to maintain a pedestrian friendly signalized intersection. Drainage improvements are being made throughout the intersection including the replacement and relocation of an existing irrigation concrete box culvert that crosses US287 just south of the intersection, and the relocation of concrete lined ditch irrigation facilities that run parallel to US287 on the east. Right-of-Way is required at each corner of the intersection as well as along the east side of US287 and the north side of SH52 to accommodate the desired improvements listed above. Work Days: 200 UDBE Goal: 10.00% It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 (X) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 CODOT - 003 - Improve the Safety and Operational Efficiency of the Intersection *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents