Similar Projects
Pleasure Bay Crossing and Main Pump Station Replacement
Design
$20,000,000 est. value
Monmouth Beach, NJ 07750

expired RFQ The Pleasure Bay Crossing and Main Pump Station Replacement
Demolition, New Construction, Infrastructure
Design
Oceanport, NJ 07757

Pleasure Bay Crossing and Main Pump Station (MPS) Replacement Project
Demolition, New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Oceanport, NJ 07757

Pleasure Bay Crossing and Main Pump Station Replacement
Renovation
Bidding
$750,000 CJ est. value
Oceanport, NJ 07757

New Regional Sewage Pump Station, Force Main and East Interceptor for the Oceanport Section of Fort Monmouth Project
Infrastructure
Post-Bid
Monmouth Beach, NJ

Raritan Avenue Stormwater Pump Station Electrical Upgrades
Renovation, Alteration
Post-Bid
$300,000 est. value
Keansburg, NJ 07734

Fairway Mews Waste Water Pump Station Replacement
Results
Spring Lake, NJ

Furnish and Deliver Pump Station/Meter Chamber Control Panels
Results
Belmar, NJ 07719

WWTP Sludge Handling System and Emergency Pump Station Improvements
Renovation, Addition
Construction
Long Branch, NJ 07740

Sediment Removal Manasquan Reservoir Water Supply System Intake Pump Station
Renovation
Results
Allenwood, NJ 08720

Pump Station Maintenance Force Account 2021-2024
Term Contract
Results
Eatontown, NJ

Shrewsbury Avenue Pump Station Upgrades
Infrastructure
Results
Tinton Falls, NJ 07724

West Keansburg Pumping Station Bypass Facility and Improvements
Renovation
Results
Keansburg, NJ 07734

Old Orchard Pump Station Relocation
Renovation
Results
Eatontown, NJ

Nolan Road Pump Station Rehabilitation
Renovation
Results
Marlboro, NJ 07751

Last Updated 09/07/2022 10:01 AM
Project Title

Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) Brielle, NJ 07712   (Monmouth County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $390,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the furnishing of all labor, materials and equipment necessary to complete rehabilitation of the Authority's existing Glimmer Glass and Brielle Pump Stations, as shown on the Drawings and as described in the Specifications. The work for these two (2) pump stations shall include, but in no way limited to, provision and implementation of bypass pumping system; shutdown and isolation of existing sewage pumps wet wells; demolition of existing concrete diversion walls, floors and flow channels within wet wells; and installation of new FRP grating levels as well as the installation of stainless steel or concrete structural support systems all as noted on the Contract Drawings. Additional work shall include cleaning and repairing of all interior concrete surfaces within each wet well; cleaning and rehabilitation and coating of metal surfaces to remain in each wet well; installation of epoxy coating system on all existing wet well surfaces; installing new stainless steel trash basket with associated mounting and railing requirements; installation of both davit crane hoists and fall protection/retrieval hoists; and installation of flood protection measures, as shown on the drawings and specified herein. In addition to the work described above, work uniquely designated at the Brielle Pump Station shall include installation of new aluminum flow channel within wet well; cutting of existing wet well top slab with installation of new fall safe hatch access; construction of architectural and facade improvements to the existing building; and installation of a 6-foot vinyl fence around the pump station site. The work shall be completed within 365-days of notice to proceed. However, it shall be specifically understood that the actual construction time frame where Contractors will be permitted to bypass sewage at the Contract pump stations will be limited to between September 8, 2022 and May 24, 2023 Bid Result : ITEM No 1 Base Bid Work for Brielle Pump Station Complete & Operational - MBE Mark III ELE - $390,000.00 ITEM No 2 Base BidWork for Glimmer Glass Pump Station Complete & Operational- Quad Construction Co - $414,760.00

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents