Similar Projects
Rehabilitation of 539 School Street
Infrastructure
Bidding
Minersville, PA 17954

Landfill Services for Solid Waste
Post-Bid
PA

Landfill
Post-Bid
Wind Ridge, PA

Landfill 2020 Area D Final Cover System Construction
Results
$6,000,000 to $9,000,000 est. value
Narvon, PA 17555

Landfill Services
Results
Minersville, PA 17954

Cell 2A Geosynthetic Liner
Post-Bid
Saint Clair, PA

Blythe Recycling and Demolition Site Brads Landfill Cell 2A Blasting
Results
Saint Clair, PA

Landfill Gas Management System Construction
Infrastructure
Post-Bid
Troy, PA

Frey Farm Landfill Vertical Expansion Stage 2 Construction
Results
Conestoga, PA 17516

Landfill 2 Fields 1RB and 3R Bulk Excavation
Infrastructure
Post-Bid
Troy, PA

Lycoming County Landfill Leachate and Gas System Cleaning, Inspection and Pipe Improvements
Results
$595,700 est. value
Montgomery, PA 17752

Furnish and Install Geosynthetic Liner and Piping System
Term Contract
Post-Bid
$1,620,000 est. value
Boyertown, PA 19512

35X-166308-Rosencrase Landfill Project
Results
PA

Landfill
Term Contract
Post-Bid
Wind Ridge, PA

Installation of the Landfill Liner System
Infrastructure
Results
Troy, PA

Reported 01/20/2022 12:00 AM
Project Title

Field 1R Stage C and Field 3R Liner System Construction

Physical Address View project details and contacts
City, State (County) Troy, PA   (Bradford County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A brief description of the project is as follows: Supply of Geogrid. Supply & Installation of subbase Geosynthetic Clay Liner (GCL). Supply & Installation of secondary 60 mil Geomembrane. Supply & Installation of leachate detection zone Geocomposite. Supply & Installation of primary GCL. Supply & Installation of primary 60 mil Geomembrane. Supply & Installation of cushion geotextile. Installation of temporary berm.

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents