Similar Projects
Convention Center Expansion - 6020.119 - City of Austin
Addition, Infrastructure
Conception
$14,234,396 CJ est. value
Austin, TX 78701

Shoal Creek - MoPac/Steck Water Quality Ponds Retrofit - 5282.156 - City Of Austin
Alteration
Conception
Less than $695,000 est. value
Austin, TX 78799

Motto Hotel by Hilton
New Construction, Infrastructure - 82,165 SF
Design
$15,000,000 CJ est. value
Austin, TX 78701

George Washington Carver Museum Cultural and Genealogy Center Phase 2A Site Utilities
Renovation, Addition, Build-Out, Infrastructure
Design
$5,100,000 est. value
Austin, TX 78702

Easton Park Section 1B Lot 4 Park
Infrastructure
Bidding
$1,500,000 CJ est. value
Austin, TX 78701

East Parke Subdivision Phase 1 Lift Station (Rebid)
New Construction, Infrastructure
Bidding
$3,057,285 CJ est. value
Austin, TX 78724

William Cannon Drive Phase 3
Infrastructure
Post-Bid
$370,000 CJ est. value
Austin, TX 78745

Travis County Correctional Complex New Evidence Warehouse
New Construction, Infrastructure - 18,800 SF
Post-Bid
$5,900,000 CJ est. value
Del Valle, TX 78617

World-Wide Water Storage Tank Remediation
Term Contract
Results

Sweetwater Village C&D: Booster Pump Station and Ground Storage Tank
Infrastructure
Results
Austin, TX

Capitol Complex, Phase 2
New Construction, Infrastructure
Construction
$225,000,000 CJ est. value
Austin, TX 78701

BCRUA Phase 2 Raw Water Delivery System
Infrastructure
Construction
$224,786,835 CJ est. value
Cedar Park, TX 78613

Dutch Bros Coffee TX1202 / Austin
New Construction, Infrastructure - 871 SF
Pending Verification
$250,000 CJ est. value
Austin, TX 78754

Engineering Discovery Building - CMAR
New Construction, Infrastructure
Pending Verification
$169,650,000 CJ est. value
Austin, TX 78712

Saint David's HealthCare Hospital / Leander
New Construction, Infrastructure - 150,000 SF
Conception
$142,500,000 CJ est. value
Leander, TX 78641

Last Updated 02/10/2023 02:23 PM
Project Title

Chisolm Ground Storage Tanks Rehabilitation (Well 5) - City of Pflugerville

Physical Address View project details and contacts
City, State (County) Pflugerville, TX 78660   (Travis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $296,203 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Exterior and interior rehabilitation This project is included in the city's FY 2023-2027 Capital Improvement Program. As of February 10, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents