Similar Projects
Kenneth D. Bailey Academy Expansion
Addition
Conception
Danville, IL 61832

2022 Community Center Fieldhouse Addition at Kankakee High School
Addition
Bidding
$441,000 est. value
Kankakee, IL 60901

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Interior Renovations at Lake Zurich High School - Bid Release 1
Results
Lake Zurich, IL

2021 Renovations at Winnetka and Northfield Campus Bid Period 1
Renovation
Results
Northfield, Winnetka, IL 60093

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

LIFT Innovation Center
Renovation - 49,700 SF
Construction
Mattoon, IL 61938

Timothy Christian Schools
Renovation
Pending Verification
Elmhurst, IL 60126

Maine South High School
Post-Bid
Park Ridge, IL

McHenry West High School - 2021 Pavement Maintenance
Results
McHenry, IL 60050

2021 Renovation Work
Renovation
Post-Bid
Less than $4,500,000 est. value
North Chicago, IL 60064

2021 Summer Work at Batavia HS and Rotolo MS
Results
Batavia, IL 60510

Prairie MS Campus and Station MS Campus
Post-Bid
Barrington, IL

Locker Room Renovations at Evanston Township HS Phase 3 and 4
Renovation
Results
Evanston, IL

Reported 07/12/2022 01:17 PM
Project Title

2022 Bond - Highland Primary School and Middle School Addition - Highland CUSD #5

Physical Address View project details and contacts
City, State (County) Highland, IL   (Madison County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $40,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work, new construction and addition to a mixed-use development in Highland, Illinois. Conceptual plans call for the construction of a educational facility; and for the addition of a educational facility. Through comprehensive study of space allocation and building needs, three projects were identified as top priorities: Priority 1 - Construction of new Highland Primary building Priority 2 - Construction of an addition to Highland Middle School Priority 3 - Addition of second gym at Highland High School As of July 11, 2022, this project is in the conceptual phase. An architect has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Middle/Senior High School, Addition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents